Bendorfean

Project Manager
Live in RomaniaNationality Romania
Share

Summary

Having graduated the Polytehnical University of Bucharest,electrical drives and automation field,I have acquired a solid background on power generation projects(thermal power plant modernisation , cogeneration power plant, photovoltaic power plant), thermal energy generation projects(heating station modernisation). I attended several courses in the following fields: 1. Project Management, 2. Renewable energy and use of renewable energy for hydrogen production, 3. Power-to-X. 4. Baterry Energy Storage Systems. I have been involved in these power and thermal energy generation projects since more than 20 years,first as Engineer and then as Project Manager. As a Project Manager ,I have joined the local representative of GE Jenbacher ,namely Total Energy Business,and participated to the implementation of the first cogeneration power plant on biogas in Romania of this company. So , I have more than 15 years experience as a Project Manager and an experience of over 15 years engineer electrical and automation in industrial field (power modernisation , cogeneration plans ,oil and gas installation modernisation-e.g. LRP modernisation). Also , I have more than 5 years experince as a Project Manager in civil construction field(office buildings , hypermarkets). I held various positions within the companies where I worked, namely: engineer, project manager, technical director. I coordinated and supervised various projects, leading work teams composed of several specialities (automation ,mechanical, electrical). I have managed projects with budgets of several hundred thousand euros to the budgets of several million euros. Several project have been successfully financed,implemented and monitored against the estimated targets(time,cost,scope). I think some of the essential factors for success of a project are very good relationship with customers, teamwork and team motivation, ability to work with people and to persuade and influence, very good communication with stakeholders projects. I consider myself a pleasant person, positive attitude, flexible and customer oriented.

Work experience

  • Project Manager

    Ramboll South East Europe SRL
    2022.09-Current(4 years)
    1. Project Management and Consulting services for renewable and non-renewable energy projects. 2.Consulting services (Owner's Engineer) for the implementation of photovoltaic parks on slag and ash depots related to energy branches and on landfills within the mining branch Beneficiary: Societatea Complexul Energetic Oltenia SA.( The Oltenia Energetic Complex SA company). Responsibilities: 1. Coordination of contract activities 2. Assessment and review of existing Feasibility Studies 3. Elaboration of Procurement documents; support during procurement process. 4. Evaluation and approval of technical design documentation for obtaining the Construction Permit. 5. Evaluation and approval of Technical Execution Project documentation. 3. Technical Due Dilligence (TDD) for BESS projects, wind power plant projects, photovoltaic power plant projects. Show less
  • Technical Consulting and Project Management

    Freelancer - Service contract with Delta Energy Europe SRL, Bucharest
    2025.07-2026.02(8 months)
    Technical consultancy and Project Management activities for the development of a Gas-Battery Hybrid System with reciprocating gas engines (Pi=40MW) and a 40 MW/80 MWh Battery Energy Storage System (BESS) within the Mija industrial park. Main responsibilities: 1. Defining and managing the scope, schedule and budget of the project. 2. Supervising and validating the concept and design details phase. 3. Coordinating engineering verifications and ensuring compliance with Romanian and EU standards. 4. Managing and leading all approval and authorization processes. 5. Drafting or reviewing requests for proposals (RFP) and specifications for EPC, O&Ms (e.g., engines), BESS suppliers, and other suppliers. 6. Leading the evaluation of offers from a technical and commercial point of view. 7. Negotiate contracts with selected suppliers, in collaboration with the owner's team and legal advisor. 8. Coordinate with national and local authorities, network operators (e.g., Transelectrica), consultants and landowners. 9. Facilitate communication between all project participants, ensuring transparency and alignment of all. 10. Conduct weekly and monthly project progress meetings, issue progress reports and resolve issues as they arise. Show less
  • Project Manager

    WPD
    2021.12-2022.12(a year)
    Project Manager -Partner WPD Responsibilities: 1. Project Management consulting activities. 2. Permitting and authorisations procedures and process -elaboration documentations activities . 3. Grid connection preliminary study and grid connection -verification and review of documentations elaborated by sub-contractors.
  • Project Manager

    ISPE PC
    2020.03-2021.12(2 years)
    1. Planning, organizing, controlling and coordinating the activities within the project allocated by the company's management. 2. Preparation of Project Management Plan. 3. Establishment and elaboration of the detailed WBS structure of the project (deliverables / roles / responsibilities / resources / activities / costs / risks) 4. Estimation and preparation of project budget. 5. Preparation of the Risk Register of the project. 6. Project schedule elaboration. 7. Ensuring the interface between the specialties of the project team. 8. Responsible for communication between the company and the client. 9. Preparation of project status reports. 10. Preparation of work situations and their approval by the client. 11. Identification of quality requirements and permanent analysis of customer satisfaction. 12. Establishing the need to conclude subcontracting contracts for design works. Examples of projects: 1. 450 MW Fagaras gas combined cycle power plant - Feasibility Study phase. 2. U5-CFSU Cernavoda-Project change destination unit 5. 3. Photovoltaic Power Plant -61,5 MW Show less
  • Freelancer

    PFA-Bendorfean Marius Traian
    2016.03-2020.03(4 years)
    Project management and engineering activities, based on service contract with , in civil and industrial construction. 1. Project management activities: a. Studying the tender books b. Identification of the activities, resources (material, human, financial) associated the project activities, the technical requirements for the execution of the projects. c. Identification of the (technical, economic, financial) risks in the projects. d. Planning the activities, resources needed to carry out the activities. e. Preparation of the Project Management Plan, a cost baseline, and schedule baseline. f. Coordination and supervision during the implementation, monitoring and control phase of the projects (re-planning necessary resources - human, material and financial -conform the real stage of projects, drawing up project execution reports (variancereport, status report, performance report, progress report). g. Coordination and supervision of the project closure phase. 2. Engineering, electrical design and automation for applications in the industrial and civil field(office buildings, hypermarkets). 3. Technical consultancy. 4. Project management consultancy. Achievements: 1. Contract with Neotronix for projects in civil constructions ,like as: LIDL -HQ Office Building , Oregon Building C , Recent Arts. Museum, Show less
  • Project Manager

    Total Energy Business
    2012.05-2016.03(4 years)
    Job domain / occupation: Energy / Extractive Industries 1.Participation , as project manager , at all stages of project , namely : initiating , planning , execution , monitoring and controlling , closing . 2. Pre-feasibility and feasibility studies. 3. Analysis of project risks(financial ,technical,technological , construction , project management) 4.Evaluation of bidders , cost estimating and technical reviews of works package of projects , review of contracts and sub-contractors selection. 5.Managing the project schedule , identifying the critical path issues and developing mitigation actions to ensure on-time delivery. 6.Continual update of the project plans , liasing with all departaments ensuring ontime delivery of all activity. 7.Identify and design feasible , sustainable , timely and cost effective solutions to business need. Achievements projects: 1. Project Manager at project:" Cogeneration Power Plant with Bio-Gas-Moara Suceava". 2. Project Manager at project: " Alpha Metal Giurgiu Cogeneration Power Plant". 3. Project Manager at project: Vest Energo - Cogeneration Power Plant, phase 3. 4. Responsible for implementin Ancillary Service System to different customer. Show less
  • Technical Support Engineer

    Vacon Romania
    2008.09-2012.08(4 years)
    Technical support -part time - for a lot of applications with frequency convertes(variable speed drives applications) in industry and civil applications ,such as: -Maritime (main propulsion,winches,thrusters,and so on). - Power plants (pumps,ventilators). - Water pumping stations. - Heating systems. - Wood(ventilators,winders,conveyors).
  • Technical Manager

    Alfera Consulting
    2010.12-2012.04(a year)
    1.Lead of technical departament. 2. Manage and coordonation execution of the projects according to technical specifications , scope of work , quality. 3. Managing the project schedule , identifying the critical path issues and developing mitigation actions to ensure on-time delivery. 4. Evaluation of bidders , cost estimating and technical reviews of works package projects , review of contracts and sub-contractors selection 5.Interfacing with customer , suppliers , vendors . 6. Provide support and technical assistance for new projects developments Show less
  • Project Manager

    Beta Impex Construct
    2008.02-2010.11(3 years)
    Job domain / occupation: Construction 1. Participation , as project manager , at all stages of project , namely : initiating , planning , execution , monitoring and controlling , closing . 2. Evaluation of bidders , cost estimating and technical reviews of works package of projects , review of contracts and sub-contractors selection. 3. Following - up the activity of subcontractors for the execution of the projects.. 4. Interfacing with customer , suppliers , vendors . 5. Continual update of the project plans , liasing with all departaments ensuring ontime delivery of all activity. 6 . Price breakdown analysis of each phase of the projects ( engineering , supply , erection , commissioning , closing . 7.Design BMS instalations for office bulding ( Sun Plaza Bucharest ) , supermakets ( Penny Market ); proposal evaluations of BMS equipments from BMS suppliers ( TAC , SAUTER , HONEYWELL ). Achievements: 1. Sema Park Office Building . 2. Biosintex surgical yarn factory . 3 . Doosan Imgb Forging Furnace modernisation . 4. Penny Market , electrical and automation installations . 5. Residential Green Vista Project . 6. Sun Plaza Office Bulding - electrical and BMS instalations. Show less
  • Project Manager

    Elcomex
    1997.01-2008.01(11 years)
    Job domain / occupation: Electrics / Mechanics , Energy / Extractive Industries, Management 1. Manage and coordonation execution of the projects according to technical specifications , scope of work , quality. 2. Managing the project schedule , identifying the critical path issues and developing mitigation actions to ensure on-time delivery. 3. Evaluation of bidders , cost estimating and technical reviews of works package of projects , review of contracts and sub-contractors selection. 4. Identify and design feasible , sustainable , timely and cost effective solutions to business need. 5. Continual update of the project plans , liasing with all departaments ensuring ontime delivery of all activity. 6. Following - up the activity of subcontractors for the execution of the projects.. 7. Price breakdown analysis of each phase of the projects ( engineering , supply , erection , commissioning , closing ). 8. Interfacing with customer , suppliers , vendors . 10. Provide support and technical assistance for new projects developments. Examples of achievements projects: 1. Radet Bucharest:"Multi Sector Project-Package W1,Lot 1.1.2 and W 1.1.4-Procurement of work in substations". 2. C.A.F. -3x100Gcal/h-CET Progresu Bucharest (Thermo-Power Plant System). 3. Radet Bucharest : Heating Station modernisation . 4. CET South Bucharest :Preheating rotary air system modernisation. Show less

Educational experience

  • Business Cambridge Program-Bucharest

    Business Management
    For detail about Business Cambridge Program visit the following site: www.business-academy.ro
  • Education Master / Postuniversitary degree EUROCOR -Curs de Project Manager. Training course TenStep

    BS, Project Management
  • Polytechnical University of Bucharest

    Master's degree, Electrical and Automation
  • Project Management Institute

    Project Management Professional(PMP), Project Management
  • Renewable Energy Institute

Languages

English
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me