Somyos

Commissioning Engineer
MaleElectronic/Electrical EngineerLive in ThailandNationality Thailand
Share

Work experience

  • Commissioning Engineer

    Toyo Engineering Corporation, Japan
    2014.12-2022.12(8 years)
    (8 years 1 month) - Collaborated with internal multi-disciplinary teams and main equipment packages e.g Gas Turbine ( 16 x Siemens SGT-800,4xGE LM 6000, HRSG (24 x Nooter Eriksen), Steam Turbine ( 12 x Alstom & GE GRT25E22&E18 ) for engineering input and technical clarification during design stage, commissioning support and also for troubleshooting of operation issue and equipment failure during warranty issues after COD - Provided technical assistance and consultation to instrument and electrical team for signal interface, plant coordination control logic during engineering stage, erection and commissioning team including Customer’s operations and maintenance personnel.
  • Commissioning Engineer

    Spencer Ogden
    2013.01-2013.10(10 months)
    - Supervised contractor to carry out Siemens Gas Turbine SGT-800/ HRSG / Steam Turbine commissioning activities. - Coordinated with the commissioning manager and the heads of the other areas of activities involving commissioning interfaces or joint exercises, ensuring the suitability of the procedure. - Conducted various tests such as small Island , large Island , safety valve pop test, loading/de-loading rate test, block load control, steam bypass system, RATA emission test, site observations and verifying proper operation and operating procedures as necessary to troubleshoot and identify equipment and system malfunctions. - Provided technical assistance and consultation to contractor's installation , Customer’s operations and maintenance personnel. - Communicated with vendors to solve various technical matters and warranty claims.
  • Senior Commissioning Engineer

    Siemens Energy
    2012.01-2012.12(a year)
    -Specialized in field commissioning of SIEMENS Gas Turbine SGT-800 new units installation, cold and hot commissioning activities, and troubleshooting of emergent of operation issues. -Carried out on the verification and functional testing of I/O interfaces to field devices, vibration rack, overspeed protection, AVR, Relay protection, inverter servo control drive, calibration and tuning of Electro-hydraulic, gas detection system and pneumatic valve, electric valve drive interfaces , Functional testing of gas turbine and steam turbine and auxiliary equipment ,Tuning and optimization of PID controllers. -Functional knowledge and experience on Gas turbine operation and maintenance -Familiar with the latest technology of gas turbine controls for Siemens. -Experienced in programming, and troubleshooting SIEMENS PCS7 with CFC function blocks and WinCC HMI interface, -Provided technical assistance and consultation to contractor's installation , customer’s operations and maintenance personnel.
  • I&C Engineer

    GHECO ONE Coal Fired Power Plant 660 MWe
    2010.08-2011.12(a year)
    (1 year 5 months) - Supervised contractor on construction and commissioning of instrumentation works in Supercritical Coal Fired Power Station. -Provided technical advice during erection and commissioning to the installation and commissioning team regarding I&C issues. -Performed walk downs of the various systems to verify works against installation drawing & construction contract specifications. -Completed the quality control documentation
  • Instrument Engineer

    Freelancer
    2010.06-2010.06
    PTT Gas Seperation Plant -Supported CCC’s TA verifying instrument devices configuration , loop checking, commissioning and start up the new four series 3++ anti-surge controllers from Compressor Controls Corporation (CCC) on Sales Gas Compressor and Refrigerant Compressors.
  • I&C Engineer

    Freelancer
    2010.02-2010.03(2 months)
    Gulf Power Generation Carried out a major outage for 2 large scale Gas Turbines (GT26) involved in control system redundancy check, control logics modification, HMI’s graphics modification, installation of new engineering stations on EGATROL and TURBOTROL systems, re-commissioning after major overhaul and provided technical advice to all C&I engineers, technicians and craftsmen.
  • Instrument Engineer

    GHECO ONE Coal Fired Power Plant 660 MWe
    2010.01-2010.01
    -Performed instrument devices calibration, vibration probes set up and loop test from field devices to TURBOTRONIC, re-commissioning and start up support after changing three Solar Gas Turbine Mars 100 in Gas Separation Plants.
  • Commissioning Engineer

    Star Petroleum
    2009.12-2009.12
    -Supported CCC to upgrade a governor set of Steam Turbine involved actuators of governor replacement with a latest Voith Turbo system. Executed the installation and commissioning of governors and CCC’s control system as well. - Calibration and tuning of Electro-hydraulic, electrical, and pneumatic valve interfaces, wiring modification work.
  • Lead I&C Engineer

    Gulf Power Generation
    2006.01-2009.01(3 years)
    - Reviewed contractor's drawings, Inspection and Test Plan, Test Procedure, Witnessed site installation, individual and overall function test, and commissioning and plant start-up. -Assist the Owner Engineer team during construction/commissioning phase of the facility and participate walk downs of areas to assess EPC workmanship in compliance with EPC agreement, standards and best practices and raise concern against issues. Developed punch-lists for non-conformity of site equipment and documentation from EPC contract and Prudent Industrial Practices to facilitate the turnover of plant to O&M Team. - Developed the appropriate procedures and computerized I&C maintenance work instructions (for PM and CM activities) and management processes in accordance with OEM recommendations, international standards and prudent industrial practices for2x300MWe Steam Turbines,4x250 MWe Gas Turbines,4xHRSG and Water Treatment Plants. - Day to day management of I&C maintenance activities. e.g. Modification of a variety of process monitoring and control systems such as DCS, PLC, Gas Turbine Control System (Egatrol), Gas Compressors and Steam Turbine Control System (Turbotrol). Calibration and tuning of Electro-hydraulic, electrical, and pneumatic valve interfaces, Functional testing of gas turbine, steam turbine and auxiliary equipment. Tuning PID controller tunings. - Deliver root cause analysis for plant issues, implementing improvements and liaising across operations and maintenance to deliver the best engineered outcome. - Inventory spare parts management & Provide all service and materials/ equipment necessary for a functional, efficient and safe plant for outage work, Warranty claims. - Ensure that the I&C System meets Safety, Environmental, reliability, availability, efficiency and budgetary targets whilst complying with legal and contractual requirements.
  • I&C Engineer

    Glow Energy
    2002.01-2006.01(4 years)
    Performed day to day maintenance of I&C field devices and Analyzers on 2x Coal Fired Boiler, 2x170 MWe Steam Turbines,8x35MWe Gas Turbines, 4x HRSG, 4x HRU, Lime Stone Plant, Coal Handling and Water Treatment Plant. • System engineer in charge of Distributed Control System (DCS), i.e. Logic modification, programming & System maintenance. • Lead engineer in charge of coal harbor control system, this control system uses the Profibus technology to link between harbor and plant. • Modification of a variety of process monitoring and control related computer-based systems (DCS, PLC), instrumentation, and equipment.
  • Instrument Engineer

    MES
    2002.01-2002.06(6 months)
    -Construction, commissioning and start-up on MAN Turbo Steam Turbine/ 3 stages axial compressor/ Gas Expander and its auxiliary system. -Performed walk downs of the various systems to verify works against installation drawing and construction contracts Specifications.

Educational experience

  • King Mongkut's University of Technology Thonburi

    Instrumentation and Control engineering
    1998.01-2001.01(3 years)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me