Preechaphol

Chonburi, Chon BuriNationality
Share

Work experience

  • Sr. Operation and Industrial Engineer

    Fabrinet
    2022.10-Current(3 years)
    ● Lead of factory layout, capacity planning and control of Lidar project.● Lead of manufacturing cycle time study to improvement Lidar project.● Operation management, Production planning and control at Module of Lidar project. Automotive customer.● Production manager at Module of Lidar project.● Establish DL efficiency data and productivity.
  • Lead Engineer, Manufacturing Equipment

    Celestica
    2021.10-2022.10(a year)
    ● Leader of Industrial factory layout design and sustaining Celestica Thailand Building 1, 7, 8 and Celestica Laos Savannakhet province. Total space more 40,000 SQ.M.● Leader of capacity planning and manufacturing cycle time study Celestica Thailand Building 1, 7.● Leader of IE for the manufacturing facility set up for the Google platform networking at building 7. - Responsibility to Preparation for machines capacity scenario in each volume, manufacturing layout, Factory facility, Infrastructure budgetary.● Leader of IE for the manufacturing facility set up for the Google Cleanroom Rho200 product. - Responsibility to Design and identify the number of processes for manufacturing layout in Clean room ISO class 7 for optical assembly. Handling design for heavy unit.● Leader of IE for increasing manufacturing capacity of Ciena Hydra product 3 phases scenario. 800, 1100, 1400 units/week.● Leader of IE for the manufacturing facility set up for the Google semi-automation Diorite. Starting from 900 units/day to future customers requires 6,000 units/week.● Leader of IE for Facebook Wedge400 project. Responsibility to prepare machines capacity/ Bottleneck analysis, Layout design with LEAN concept. From NPI until mass production.
  • Operations Engineering Specialist

    Celestica
    2017.10-2021.09(4 years)
    ● Leader of Industrial factory layouts Celestica Thailand Building 1, 7, 8 and Celestica Laos Savannakhet province.● Leader of capacity planning and manufacturing cycle time study Celestica Thailand Building 1, 7.● Project manager of Celestica building 1 factory re-entire. Project relayout overall factory to increase manufacturing space and LEAN layout improvement 15,000 SQ.M. ● Co-Project manager of new Celestica building project (Building 7).- Responsibility - Project management officer in schedule controller, layout design, building buy off, IEAT document coordinator in construction. - Facility to machine installation. - Warehouse set up and in plant logistic design.
  • Lead Industrial Engineer

    Celestica
    2015.10-2017.09(2 years)
    ● Leader of Industrial factory layouts Celestica Thailand Building 1,2,3,8 and Celestica Laos Savannakhet province● Project manager of New canteen construction at Celestica building 1 to services employee 2,000 SQ.M.- Responsibility - Concept design with designer. - CAPEX, RFQ and bidding. - IEAT document submission. - Coordination with construction suppliers for progress tracking, Quality and schedule. - Budgetary controller● Co-Project manager of Lumentum PSM4 project. - Responsibility - Production layout design. - Coordination with construction suppliers for clean room class 6 and class 7. - Budgetary controller
  • Senior Industrial Engineer

    Celestica
    2013.10-2015.09(2 years)
    ● Co-Leading of Industrial factory layouts design Celestica Thailand building 1, 2, 3, 4, 5● IE engineer of Thailand team to New setting up factory at Celestica Laos.- Responsibility to design overall factory layout, material flow, In plant logistic, warehouse, office and canteen.● IE engineer of Lumentum T-XFP and Modulator project. Product transfer from Canada to Thailand. - Responsibility to layout process design, material flow under Clean room class 7 and 8.- Responsibility to cleanroom design with M&E engineer and supplier for built new Clean room class 7 and 8.
  • Industrial Engineer

    Celestica
    2009.12-2013.09(4 years)
    ● IE engineer of Industrial factory layout design Celestica Thailand Building 1, 4. Customer are Poly communicate, Hitachi, Openpeak, Google, Ciena and Spirent.● Facilities support of manufacturing in workstation, storage shelf, tooling, layout movement.

Educational experience

  • Burapha University

    Industrial Engineering bachelors degree
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me