James

Construction Site Manager
MaleEnergy Project ManagementLive in AustraliaNationality
Share

Work experience

  • Construction Site Manager

    Goldwind
    2019.12-Current(6 years)
    (5 years 9 months) Biala wind farm 31 x GW 3s 3.57mw Esperance wind farm 2 x GW 4s 4.5mw Clarke Creek wind farm 100 x GW 4s 4.5mw • Responsible and accountable for coordinating and overseeing all site operations including the safety of all personnel on the site. • Implementation & management of all OHS and Environmental Plans in consultation with the HSE representatives on the project. They will review all work plans from Sub-contractors including SWMS, EWMS, inspection and verification of all work for compliance with the nominated plans and HSEQ system requirements. This includes compliance with SWMS, plant inspections, site inductions. • Overseeing & monitoring all construction activities for compliance and providing status updates to the TSI Project Manager as required. • Coordination of all on-site activities between Goldwind, BoP contractor, subcontractors and all other stakeholders, including WTG installation & commissioning teams • Managing onsite Industrial Relations (IR) issues as they arise • Managing the on-site interfaces between GWA, BoP Contractor & Grid Connection Works team • Oversee, monitor and implement the project Quality Assurance system. • Communication of construction/installation/commissioning-related details to the TSI Project Manager for use in project communications. • Maintenance of the construction risk register including the implementation of mitigation measures in accordance with the HSE system requirements. • Represent Goldwind in the establishment and maintenance of excellent working relationships with all stakeholders • Reporting to the TSI Project Manager weekly & monthly with construction updates, OHS&E incident reporting, issues etc. • Lead incident investigations and reporting if required • Managing relations with the relevant local Authorities as well as traffic management issues
  • Installation supervisor

    Nordex Group
    2019.10-2020.01(4 months)
    5 x N131 1 x N117 Wind turbine Installation Supervisor resolving mechanical issues during installation, supervising and supporting installation crews. Delivery of tool box talks and daily safety briefings. Quality control of mechanical finishing, Gate 1 and Gate 23 inspections, safety inspections and spot checks and preparation of quality and safety documentation
  • HV upgrades

    MHI Vestas Offshore Wind
    2019.03-2019.10(8 months)
    Burbo Bank Extension, Walney 3 Extension, Blyth and Aberdeen wind farm
  • Construction site manager

    Ainscough Crane Hire
    2018.07-2019.03(9 months)
    • Manage day to day delivery of major Projects • Assist in the management of construction teams / programs • Plan and define project steps or schedules, consistent with defined review milestones and priorities, to contribute to the design of the overall project plan. • Contribute to the identification, implementation and monitoring of day- to-day support for the project activities including contract compliance, risk management, Health & Safety, financial management and reporting, document control, assurance and governance, to ensure adherence to company standards • Review and manage the development of project documentation, programmes, master budget etc • Production of reports to suit relevant stages of the projects and project governance • Assisting in cost management, reporting, requisitions and documenting, process support for financial related matters • Support project compliance • Provide all work outputs in an accurate and timely manner • Assist project teams with stakeholder & strategy meetings 16 x Senvion MM92 Mynydd y Gwair 13 x Senvion MM92 Bad a Cheo 3 x Senvion MM92 Common Barn
  • Director Of Field Operations

    TRG Wind
    2014.02-2017.11(4 years)
    (3 years 9 months) GE service GE Blade bearing exchange GE pitch and Battery exchange Nordex service Nordex safety Notifications Nordex installation
  • O&M Lead

    GE Power
    2014.03-2015.03(a year)
    • Day to day management of team of technicians working on 1.6 and 2.5 turbines • Carrying out end of warranty repairs, Retrofits, break in maintenance and punch lists • Responsible for the site documentations • Liasing with site and project management
  • Offshore Construction Supervisor

    Wind Energy Services
    2013.06-2014.02(9 months)
    • Responsible for construction of Areva M5000 -116 and the daily management of the site participants. • Working on the erection of turbines on site as described in the project organisation chart. • Responsible for distributing work and tasks to the project participants. • Co-coordinating with site and project management to ensure right manning, tools and equipment are on site. • Perform Tool Box talks. • Participate in the meetings with Site Management, QA and HSE. • Responsible for the daily management of employees and sub-contractors on site. • Collection of work orders and timesheets from • Responsible for reporting status of work and hours spent working on site for all participants. • Suggest improvements to work procedures and equipment.
  • Commissioning team lead

    OWS (Formally BARD)
    2012.12-2013.07(8 months)
    Germany • Appointed lead responsible for a 20 strong team • Full commissioning of BARDS first wind turbines • Pre and post energisation • Completed 500 hour service work • Responsible for the site documentations • Liasing with site and project management
  • Construction Team Lead/supervisor

    MAMMOET WIND LTD
    2012.07-2013.01(7 months)
    • Appointed lead of 16 strong construction team • Working on the installation of Siemens 2.3mw and 3.0DD • Initial for Zephyr 1, contract extended to complete works on Zephyr 2, Millertorp • Also worked on the Haiger shell tower prototype in Germany • Responsible for the site documentations • Liasing with site and project management
  • Wind Turbine Construction Technician

    Global Wind Service
    2010.05-2012.08(2 years)
    (2 years 3 months) • Employed as a Technician working on Siemens Turbines • Worked on installation of 2.3mw and 3.6 mw • Carried out works on Walney 2, Sheringham Shoal and Teeside
  • Mechanical Team Tead

    Seajacks UK Ltd
    2007.12-2010.06(3 years)
    (2 years 6 months) • Employed as team lead working on Greater Gabbard • Rigged and lifted clamps, torqued bolts to the correct specification • Rigged the TP in preparation for the lift • Responsible for jacking and levelling the TP after installation under instruction from the survey team.

Educational experience

  • Hull College

    HNC mechanical Engineering
    2000.12-2003.01(2 years)
  • Industry Qualifications

Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me