    June to October 2020 - Procurement works for LNG options for a potential Black Start auction bid in the East of England.2020 to 2023 - Project Procurement Manager (PPM) including Pre and Post Contract Management of two Battery Energy Storage System (BESS) schemes at Lisdrumdoagh and Stephenstown in Ireland as part of RWE Innogys renewable energy portfolio. 2016 to 2023 - Procurement and Commercial Management of the Didcot and Tilbury Power Station Demolition Contracts and support contracts as part of the RWE PM team for RWE Generation. 2018 to 2019 - PPM for Peaker Project for RWEG Business Development at Ferrybridge looking at Fuel Gas Options.2022 to current - execution PPM for 40 Kw Gas Engine schemes in Cheshire and Grimsby - £20m.2023 to current - execution PPM for Pembroke Power Station Synchronous Compensator Scheme - €62 m.
  • Associate Director

    Simpson Lynch & Co Ltd
    2008.03-2018.05(10 years)
    Provision of Consultant Commercial Management and Contractual Advice for EC Harris (Quantum Consultant on a £10million NEC2 Option A claim), Commercial Marine and Piling Ltd (Contractual Advice for marine works under NEC2 contract), Dean & Dyball Ltd (reservoir construction for Thames Water under NEC2 option C), FTI Brewer (Counter Claim Quantum Consultant for Dubai Racetrack Developement Arbitration), Balfour Beatty Mott MacDonald (Commercial Management and Estimating Role for Highways Maintenance Area 5) , Alstom Power Ltd (Commercial Management for a gas fired power station build) and RWE Technology (Procurement for Tilbury biomass power station permit extention project and Commercial Management of main Contractor additional works account on a £250m new build biomass CHP in Scotland), Post Hand Over procurement and commercial management to enable full commercial electricity production, Commercial management for £28m demolition contract of Didcot A Coal Fired Power Station (under NEC3), Commercial Management Support for RWE Innogy to close out legacy claims form Execution phases of Gynt y Mor Off Shore Wind Farm (under NEC3) and Cwm Dyli and Dalgorrog Hydro Electric schemes, Commercial management for £6m Didcot Demolition Completion Works (under NEC3), Commercial management for £22m Tilbury Demolition (under NEC3) and for CCGT Development Works and Embedded Generation schemes, Tender Development and Procurement support of an Energy Centre Contractor for a district heating scheme from an existing CHP Plant - TO DATE
  • Energy Centre New Build Procurement (though Simpson Lynch)

    RWE Technology International
    2017.09-2018.04(8 months)
    Procurement support for a new build Energy Centre as part of a District Heating Scheme for the Scottish Government.
  • CCGT Energy Centre Consent Works and Embedded Generation Schemes (though Simpson Lynch)

    RWE Technology International
    2017.05-2018.04(a year)
    Procurement and commercial management of several specialist environmental Consultants for the Consents Team and cost advice for various embedded generation schemes at development and execution stages for the internal Business Development client.
  • Didcot A Demolition - Completion Works (through Simpson Lynch)

    RWE Technology International
    2017.05-2018.04(a year)
    On-going Commercial Management for the demolition completion works as part of the PMs professional team.
  • Former Tilbury Coal Fired Power Station Demolition (though Simpson Lynch)

    RWE Technology International
    2016.05-2018.04(2 years)
    Commercial management of the Demolition Contractor as part of the PMs professional team, working under the NEC3 Option A contract including scrap reconcillaion for a pain / gain mechanism, a deed of amendment negotiation and agreement and a novation agreement with a separate land remediation contract in two phases.
  • Didcot A Coal Fired Power Station Demolition (through Simpson Lynch)

    RWE Technology International
    2015.03-2017.09(3 years)
    Commercial management of a £28 million demolition contract procured under the NEC3 Option A and subsequent incident commercial management. Working with and reporting to the PM, Senior PPM and the Thermal Projects Business Partner. Close out of Final Account after termination of Main Contractor.
  • Tullis Russell Papermakers CHP (through Simpson Lynch)

    RWE Technology
    2013.08-2015.11(2 years)
    Working with the Legacy Manager and reporting to the Senior Commercial and Procurement Business Partner to manage and close out the Employers Instructions, Claims and Provisional Sum accounts on a £250m Biomass CHP in Markinch, Fife - Main Contract agreed in December 2014.From January 2015, Procurement and Commercial Management of Post Handover Works for the balance of the technical work packages on T&M and lump sum procurement basis valued at £15million, in order to achieve full commercial generation of electricity. Reporting to the Interim Head of UK Procurement
  • Gwynt y Mor Off Shore Wind Farm & Cwm Dyli & Dalgorrog Hydro Electric Schemes (through SL & Co)

    RWE Technology International
    2014.10-2015.04(7 months)
    Commercial Management Support and Negotiation with RWE Innogy to close out legacy claims from Execution phases of Gwynt y Mor Off Shore Wind Farm (under NEC3) and Cwm Dyli and Dalgorrog Hydro Electric schemes.
  • Project Procurement Manager (through Simpson Lynch)

    RWE Technology
    2012.07-2013.07(a year)
    Procurement of Technical Work Package for Non Flue Gas Emissions Compliance at Tilbury Power Station Biomass Phase 2 Project budgeted at £450m and various other site investigation and preliminary works packages.
  • The APCM & Commercial Manager (through Simpson Lynch)

    Alstom Power
    2010.01-2012.06(2 years)
    1 Billion Euro Combined Cycle Gas Turbine Power Station capacity of 2400Mw. Client facing settlement of contractual issues, insurance claims and Commercial Manager for the £140million M&E packages reporting and NCR management.
  • Arbitration Defence Counter Claim Quantum Consultant (through Simpson Lynch)

    FTI Brewer Consulting - Dubai
    2009.06-2009.11(6 months)
  • Senior/Managing Quantity Surveyor

    Dyer & Butler Ltd
    2000.06-2008.02(8 years)
  • Senior Quantity Surveyor

    Hochtief (UK) Construction Ltd
    1994.04-2000.06(6 years)
  • Graduate Engineer

    Hall and Tawse Ltd
    1992.09-1994.04(2 years)

Educational experience

  • College Of Estate Management - University of Reading

    Quantity Surveying diploma
  • University of Brighton

    Construction Engineering and Management 2:1 bsc (hons)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me