WEI FU
Senior Field Service Engineer
MaleFAE Field Application EngineerLive in MalaysiaNationality
Share
Work experience
Senior Field Service Engineer
JIPAL HI-Tech2021.08-Current(5 years)(4 years 11 months) ➢ Dealing mainly with Teikoku Taping System for Fully Automatic Tape Remover and Fully Automatic Tape Laminator (EXR2 & VXL) ➢ Onsite Machine buy-offs and installation at customer site. ➢ EXR2 doing after customer exposed process and used tool to removed film cover tape. ➢ VXL doing customer provide the wafer size 12'' to run lamination dry film tape with laser CO2 cut for customer optimization and verification. ➢ Onsite Troubleshooting of handler and software issues. ➢ Onsite software and mechanical upgrades machine. ➢ Providing technical consultancy to customers. ➢ Providing New machine training to new customers (Technicians andEngineers).Field Services Engineer
JIPAL Hi-tech Pte Ltd2018.06-Current(8 years)(8 years 1 month) ➢ Dealing mainly with ICOS (KLA-Tencor) AOI Visual inspection machine (T120,T220, T340, T390, T640, T740 and T890LFF/XP) ➢ Onsite Machine buy-offs and installation at customer site. ➢ Doing data correction related to GR&R and feasibility collection. ➢ Onsite Troubleshooting of handler and software issues. ➢ Onsite software and mechanical upgrades machine. ➢ Providing technical consultancy to customers. ➢ Providing New machine training to new customers (Technicians &Engineers).Technical Service Solution Engineer
Keysight Technologies2017.01-2018.05(a year)(1 year 5 months) Malaysia Act as the prime coordinator for planning scheduling and organising the recall and dispatch of Test & Measurement (‘T&M’) Party/Other Equipment Manufacturer (‘O periodic and ad-hoc calibration, repair or service. ➢ Organise any onsite/VOSCAL calibration of T&M equipment. ➢ Take responsibility for coordination of all onsite activities with Third Party/OEM suppliers. ➢ Provide loan equipment (subject to limited availability) to minimise the impact of equipment downtime. ➢ Liaise with nominated department contacts on a regular basis regarding the release of all T&M equipment for calibration and repair. ➢ Manage all equipment using designated asset management tools, ensuring service records and database integrity is maintained. ➢ Deliver Metrics for Operational & Management Reporting and quarterly performance review. ➢ Conduct inventory audits re-labelling and bar-coding of all test equipment and locations to ensure complete accuracy. ➢ Proactively manage repairs, including alternative product information to assist Customers decision making process. ➢ Initiate shipping of return to vendor calibrations and repairs.Equipment Engineer
Seagate Technology2013.03-2016.12(4 years)(3 years 10 months) ➢ Maintain and repair production line equipment, so to optimum machinery operations efficiency and reduce machines downtime. ➢ Perform scheduled maintenance for production line, factory facilities. ➢ Perform all the test machine Bi-weekly, monthly and semi-annual PM. ➢ Support any upgrading machine projects. ➢ Troubleshooting all the faulty spare part and cost reduction for send out to repair. ➢ Responsible for setting up and maintaining a tight control. - Package machine before send out to Korat. ➢ Preparation of required monthly reports. ➢ Use SQL to query out machine bad yield report and down the machine for troubleshooting. ➢ Monitoring and follow up of assigned projects, activities and progresses as well as providing regular project status updates to the management. ➢ Co-ordinate with spare part supplier, service agents and contractors for cost effective and speedy maintenance. ➢ Update, maintain and execute maintenance schedule/plan. ➢ Requested purchase request(PR), purchase order(PO) and MSA to sent out spare part.Technician
Massive Success Sdn.Bhd2009.04-2011.09(2 years)(2 years 6 months) ➢ Assembly and connect all wiring for SRM Integration machine. ➢ Responsible of soldering work on transformer and noise filter. ➢ Able to control drills machine. ➢ Assemble the whole sub board. ➢ Power control wire (MCB wire connect to relay, MCCB power control wire to ELCB (earth leakage circuit breaker). ➢ To assemble, fine tune and test run automation machine vision equipment ➢ In charge of all scheduled assignments ➢ To support any other production activities as assign
Educational experience
University of Sunderland
Electrical and Electronics Engineering2013.01-2015.01(2 years)Penang Skills Development Centre
Electrical and Electronics Engineering2010.01-2013.01(3 years)
Certificates
Six Sigma Certifications
AI Appreciate Badge - AI untuk
Rakyat
Project Management Foundations
AI Aware Badge - AI untuk Rakyat
Excel Fundamentals – Formulas for
Finance
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
60****9115
Membership will unlock the resume
Also view
