Syed Haris Bin Rashid

Deputy General Manager@K-Electric
Nationality
Share

Summary

Electrical Engineer, Project Management, Loss Control | Data Center Operations | Energy Projects Lead | Powering Data Centers | Authorized to work in States. I am an experienced Electrical Project Manager specializing in MV/LV distribution networks with a proven track record of delivering large-scale power projects on time and within budget. With a Bachelor’s degree in Electronics Engineering, I possess deep technical knowledge in power generation, transmission, and distribution systems, including system improvement projects that have significantly reduced power outages and enhanced reliability. My expertise spans project management, preventive and corrective maintenance, risk mitigation, and team leadership, having led cross-functional teams to exceed efficiency, safety, and stakeholder satisfaction targets consistently. Skilled in coordinating complex electrical infrastructure projects—ranging from HV/MV switchgear installations and substation commissioning to network health monitoring and predictive maintenance—I excel at optimizing operational performance and cost-effectiveness. I am committed to driving continuous improvement using data-driven decision-making, innovative project management methodologies, and strong communication skills, ensuring compliance with quality, safety, and environmental standards. Key competencies include power system protection, energy efficiency, outage reduction, budget management, and stakeholder engagement.

Work experience

  • Deputy General Manager

    K-Electric
    2025.10-Current(10 months)
  • Manager - Projects

    K-Electric
    2022.05-2025.10(3 years)
  • Deputy Manager

    K-Electric
    2020.09-2022.05(2 years)
  • Assistant Manager

    K-Electric
    2017.08-2020.09(3 years)
  • Project Engineer

    Dee Engineering
    2016.11-2017.07(9 months)
  • Shift Engineer

    Lucky Renewables (Private) Limited/Yunus Energy Limited/ Lucky Energy Pvt. Ltd. · Full-time
    2016.07-2016.10(4 months)
  • Assistant Shift Engineer

    Lucky Renewables (Private) Limited/Yunus Energy Limited/ Lucky Energy Pvt. Ltd. · Full-time
    2014.09-2016.07(2 years)
  • Trainee

    Lucky Renewables (Private) Limited/Yunus Energy Limited/ Lucky Energy Pvt. Ltd. · Full-time
    2013.09-2014.09(a year)

Educational experience

  • Sir Syed University of Engineering & Technology (SSUET)

    Bachelor of Science (BS), Electrical and Electronics Engineering, First Division
    2009.01-2012.01(3 years)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me