
Siricheth
MaleNationality
Share
Work experience
SALES MANAGER
VALVIDA COPORATION CO., LTD2023.10-2024.11(a year)Company Job Description : Call to Appointment for Present the Product (Valve). Meeting the Sales Traget. Get Inquiry and Clarify the Technical Data Visit the Customer for Present the Product (Valve) Febuary , 2020 to Febaury, 2023Service Manager
THAI VISTA CO., LTD2018.11-2020.01(a year)Job Description : Visit the Client and Plan to Appointment. Incase , Get Inquiry for the Product to Make the Quotation and Follow up. Incase , Get Inquiry for Construction job. Pre-BOM Scope : - Site Survey - Take off the Material & Mark the BOQ - Full Fill the Both ( Material & Labor Cost) - Asking the price in the country & foreign Country. On site Service Phase : - Positioner (Seimens Mfg) Training. - Internal Test the Control Valve and Manual Valve . - On Call to Consult for the Customer. Project Reference : TUNTEX PETRO ( SERVISE VALVE) MITR PHOL SUGAR COMPANY LIMITED KHONBURI SUGAR PUBLIC COMPANY LIMITEDProject Engineer
I&EAdvance Engineering Co., Ltd.2017.04-2018.10(2 years)Job Description : Visit the Client and Plan to Appointment. Incase , Get Inquiry for the Product to Make the Quotation and Follow up. Incase , Get Inquiry for Construction job. Pre-BOM Scope : - Site Survey - Take off the Material & Mark the BOQ - Full Fill the Both ( Material & Labor Cost) - Asking the price in the country & foreign Country. Construction Phase : - Prepare Any Material. - Provide the Manpower. - Kick Off Meeting and Control the progress of works.Senior Sales & Service Engineer
Blue Stacks Company Limited2015.02-2016.02(a year)Job Description : Visit the Client and Plan to Appointment. Incase , Get Inquiry for the Product to Make the Quotation and Follow up. Incase , Get Inquiry for Construction job. หนา้ที ่2 Resume-SRT51_Submit.xls หนา้ที่ 3 จาก 6 Pre-BOM Scope : - Site Survey - Take off the Material & Mark the BOQ - Full Fill the Both ( Material & Labor Cost) - Asking the price in the country & foreign Country. Construction Phase : - Prepare Any Material. - Provide the Manpower. - Kick Off Meeting and Control the progress of works. Project Reference : Ptt OC ( An Existing GC to Remove & Install at Trainning Central) Ptt BV ( OGC ANZ Installation) JFE ( Verify the Moisture ) MKUTT ( Tube Bending & Fitting & Valve Install for Furnace System)Instrument Leader
Alpha Group Co., Ltd2014.07-2014.11(5 months)Job Description : Pre-BOM Scope : - Support Sales ( Site Survey ) - Take off the Material & Make the BOQ - Full Fill the Both ( Material & Labor Cost) for Pre-BOQ - Asking the price in the country & foreign Country. : Contruction Phase - Kick Off Meeting and Control the progress of works. - Prepare Any Material. - Provide the Manpower. - Probe Design and Probe Install. - Coordinate with Sub-Contact & Main-Contact. Project Reference : SPP-TOP > CEMs System . PTT Tank > Calibrate Transmitter. BP Castrol > Moisture (Turbidity Type) Assembly & Flow Meter Install.Assistant Service Manager
MJ Bangkok Valve & Fitting Co., Ltd.2012.02-2014.06(2 years)Job Description : Technical Support - Support Sales Team (Manual Valve) - Support Sales Team (Control Valve) - Support Sales (Incase,Sales not Clear Any Drawing,Spare Parts) - In House Trainning. - Visit Customer & Selling Service. - Arrange Any Document : Field Service - PTT AR Shutdown. - Uhde / TOP Shutdown. - Mischelin Shutdown. - PTT I4 Shutdown หนา้ที ่3 Resume-SRT51_Submit.xls หนา้ที่ 4 จาก 6Instrument Technician
Adeco Recruitment Ltd2011.08-2011.12(5 months)Job Description : Final Inspect the Loop ( from Field Equipment to DCS) Function Test ESD System. - Expedite the Manpower c/w Simulator Meter for test the function control. - Issued the Punch List back to Contactor. - Field Inspection for Construction by follows the STD Hook Up Start up the Plant - Re-Calibrate the Control valve at Furnace Area. - Re-Calibrate the Control valve at SRU Unit. - Calibrate the Ultrasonic Flow. - Re-Calibrate the Transmitter (Re-Range).Sale & Service
Industrial Product and Service Co., Ltd2008.07-2011.07(3 years)Job Description : Planing & Visit the Client for Present Products. Site Survey for the Construction Job. Made the BOM List and Submit the Quotation. To Clarify any Technical . Monitoring the Sale Traget ( By Funnel Form).Sale & Service
IMI Industrial Co., Ltd2006.02-2008.06(2 years)Job Description Planing & Visit the Client for Present Products. ( Instrument ). Site Survey for the Construction Job. Made the BOM List and Submit the Quotation. To Clarify any Technical . Monitoring the Sale Traget ( By Funnel Form). หนา้ที ่4 Resume-SRT51_Submit.xls หนา้ที่ 5 จาก 6Sale & Service
PNR Valcon Co., Ltd2005.07-2006.01(7 months)Job Description Planing & Visit the Client for Present Products. ( Tool & Pump & Control Valve). Site Survey for the Construction Job. Made the BOM List and Submit the Quotation. To Clarify any Technical . Monitoring the Sale Traget ( By Funnel Form).Instrument Technicial
ABB2004.02-2005.06(a year)Job Description : PM Check ( Boiler , Gas Turbine , Tank Frame , Compressor). Maintenance for Instrument Equipment. Check Loop for Point Problem. Calibration for the Instrument Equipment. Site Survey for Planing.Customer Support & Service
Yamatake ( Thailand) Co., Ltd.2002.11-2004.01(a year)Job Description : Overhaul the Control Valve . Calibration the Instrurment Equipment. Made the Test Report of Control Valve. Control Sub-Contact for Take Out the Control Valve. Dialy Report the Status to Client. Coordinate and follow up with Shop Yamatake.- WNSR Limited Partnership1993.05-2002.10(10 years)Position : Instrument Foreman (1),(2),(3) Instrument Technician (4) QA/QC (5) Estimator (6),(7) 1 Project Ref. : TLP Cogen (Rayong Power Plant) Job Description : Pre-Calibration for Instrument Equipment. Field Installation & Loop Test. Cable Gland & Termination Cable. 2 Project Ref. : IPP / Turn Around Job Description : Pre-Calibration for Instrument Equipment. Field Installation & Loop Test. Cable Gland & Termination Cable. Standby & Start up. 3 Project Ref. : Thai oil (Public) Company Limited / Turn Around Job Description : Pre-Check & Calibration Control Valve As Found & Overhaul Control Valve & Safety Valve Control Valve Re-Install and Loop Test. Leakage Test & Static Body Test. หนา้ที ่5 Resume-SRT51_Submit.xls หนา้ที่ 6 จาก 6
PROJECT MANAGER
BBM POWER SUPPLY AND ENGINEERING CO., LTDJob Description : Visit the Client and Plan to Appointment. Incase , Get Inquiry for the Product to Make the Quotation and Follow up. Incase , Get Inquiry for Construction job. PM Reactor and Design the Reactor and Clarify the Instrument Hoop up. Pre-BOM Scope : - Site Survey - Take off the Material & Mark the BOQ - Full Fill the Both ( Material & Labor Cost) - Asking the price in the country & foreign Country. Construction Phase : - Prepare Any Material. - Provide the Manpower. - Kick Off Meeting and Control the progress of works. - Final the Report and Instruction Manual. - Coordinate the Safety and Third Partty. หนา้ที ่1 Resume-SRT51_Submit.xls หนา้ที่ 2 จาก 6 Project Reference : PTT RO (POLYOLS) PROJECT. (2022) PTT GC 12 ( LIQUID COMONOMER ) HIGH PRESSURE PUMP PROJECT. (2022) PTT RO (EO-PO) PROJECT. (2022) PTT PLC (GSP#6) UT SENSOR ONLINE THICKNESS PROJECT. (2022) PTT RO (POLYOLS) OF REACTOR 5.0 L SEVICE ( SEAL PART REPLACEMENT) (2022) PAP / SCG (Ethylene Plane) / Maunal and Auto the Temp. Control and HMI Monitor. (2022) SIAM AG (AUTO GREASE) / PTT GC4 PROJECT. (2022) AS FIRST (SUBMERGE PUMP) Panel Control Wiring and Install. (2022)
Projects
Revamp
Utility Supply for Extruder (PTTGC BO#16)
IRPC
Educational experience
Burapha University
Education Technology.South-East Asia University
Electrical Power Technology.
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****4169
si**@**om
Membership will unlock the resume
Also view