
Ronnarit
HSSE. Trainner.
Nationality
Share
Work experience
HSSE. Trainner.
GCME. Co,ltd2024.01-Current(2 years)Client GC Group area. (Freelance period time.)HSSE. Superintendent.
SAKURA2022.01-2024.01(2 years)& BIO. Project GCME Area. (Owner AGC Vinythai) Project Oleflex Improvement Project Phase #1, 2, (GC Grouarea Branch #2,3)HSSE. Supervisor.
Aibel2021.01-2022.01(a year)Thailand Co,ltd. Project ATH LCB Yard 1 Module work. ( Laem Chabangsea port)HSE Supervisor
SAIPEM/ CTCI. Join venture Co,ltd.2019.01-2021.01(2 years)Project PTTLNG Nong fab LNG Receciving Terminal. Marine Offshore work.( JettySafety Supervisor.
(PTTME)2012.01-2018.01(6 years)Project & Area Owner: Conduct of works: EPC, EPCA, Project Safety, Construction, Engineering and Maintenance work support for PTTGC Group. Relocate H2 and Hexane Line for New WWTP for ORP Project. @PTTGC2, HDPE area. Relocate UG facility for new rack room of ORP project @PTTGC2,3 Fire water 2nd for south side Project and portable water @PTTGC2,3 22kv. Improvement feeder Project.@PTTGC2,3/ I-1, I-4, HDPE Area. Common fire water for both OLE1,2 Project. @PTTGC2,3/ I-1, I-4, HDPE Area. Pile Repair jetty bridge#1,2 Project.@ PTTGC#7, BTF Area. Turnaround PTTPE 2016 @ PTTGC#11. ANNAPURNA Project @ VCX Plant. ARII DB Project @ PTTGC#5 (Aromatic2).Tech, ( mechanical Static Equipment)
Qualitech Engineering &construction co., ltd.2000.01-2002.01(2 years)Responsibility; Maintenance, Shutdown, Tuarnaround work for Rayong Olefins Co., Ltd. and SCG Group. Shutdown maintenance service for Static Equipment such as Column, Drum, Vessel, Heat Exchanger and Piping work TMMA Long/Turnaround November 2004 TPAC Turnaround October 2004 TMMA Turnaround May 2004 TPCC Plant 1,2 Shutdown Feb 2004. ATC Turnaround Jan 2004 BST Elastomers December 2003HSSE. Supervisor.
GCME Co, ltd2019 HDD FOR ETHYLENE AND PROPYLENE Under ground pipe line Project. & HP Steam upgrading Project.Off-shore Safety Officer.
CR Asia Co,ltd2018 Project/ Area Owner: Jasmine/ Mubadala Plate form, FPSO. Tantawan/ Chevron Thailand, FPSO. Conduct of work: Vessel cleaning Upsteam process, Confined space work.- PTT Maintenance &engineering co,ltd.
- VPE.& Vatana Overseas pte,ltd (vos)2009- 2012, BV OSBL# Add value Project @ PTTGC#7, BTF Jetty Area. New fiber optic Project @ PTTGC2 to PTTGC6. Improvement building blast resistance Project @ PTTGC#7 (BTF). Responsibility; Project ENG &Construction work Control all Subcontractor comply with Plant Procedure, policy & LAW Kick-Off Meeting, JSA, Method Review, Endorsement before Start work Observe Morning Tool box talk, PTA, group meeting comply with safety procedure. Permit & JSA control. Control measurement UA/UC, BBS mitigate that all activities follows the safety regulation. Safety meeting and committee project SHE management. Audit Environment, EIA All safety document controller comply with ISO 9001, 14001, TIS/OHSAS 18001. All Equipment & vehicle in-out to site check point. Safety Promotion achievement and motivation worker to target ZERO Accident <I Safety measurement or assignment, presented to the Safety Manager. Follow up, responsibility assign by safety Manager. Position; Safety supervisor. Conduct of works: Structure, Piping, Mechanic work.
Supervisor.
Rayong Engineering & Plant service co., ltd.2003, going confined space. Familiar with multi sensors gas detector and personal gas detector Responsibility; Industrial Chemical Cleaning Process
Projects
Exxon mobile, SPT Olefins Recovery& Facilities
SPT Olefins Furnaces Project (Thailand)
DOW/ TOYO THAI HPPO2-HP Project.
Clean fuel expansion Project, TPC#vc
#vcm2, IRPC, TMMA, ROC
Reformer and Aromatics Project Complex 2
RRC Upgrading Project.
S1, Shin- Etsu Silicones(Thailand)tpe /hdpe3.@ thai polyethylene co.,ltd.
PTT Separation gas plant mabtaphut. #2
Educational experience
thammathirat university and Height vocational in Civil, from Ubon
Occupational Health and Safety
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****5919
Ro**@**om
Membership will unlock the resume
Also view