
Pansiree
FemaleNationality
Share
Work experience
Senior coporate palnning
Advics manuafacturing Thailand co Ltd2024.01-Current(2 years)(Automotive part) l Prepare/summarize and analysis cost of new project and update cost status in each changing point until launched each project l Coordinate cost reduction activity to achieve company target. l Summary the cost of new project to support company long term business plan. l Ensure data accuracy of BOM product,BOM packing, Route of production related in standard cost & time of new products. l Calculate cost merit for project improvement(Kaizen activity) Achievement Program for register cost request sheet for set standard step for work by VBALeader project for VEC part
Siam Hitachi Elevator2012.01-2023.01(11 years)Training at Singapore for 6 months.Offshore Engineer
(Viking Life-Saving Equipment(Thailand) Ltd)2023.01-2023.01(Life saving equipment of maritime) l Cooperate with external(Project manager of Denmark) for specification of evacuation equipment project. l Create drawing along with customer specification l Set up BOM of project in system. l Set up routing of project in system. l Plan production schedule for product. l Monitoring material requirement for project use. l Create and maintain for Work instruction of current design and new design. l Support production's problem and solve problem for on time project target. Achievement Program checking attribute of part.(such as On hand,Lead-time,Vendor,Price) by VBA The program can reduce working time and reduce process working Program for set up Routing by Excel for reduce working time and repeat process Program for set up BOM by Excel for reduce working time and repeat processCost Control Design Section Manager
Siam-Hitachi elevator Co.,Ltd2020.01-2023.01(3 years)l Evaluate price and cost of project relate to the quotation for current project and develop project l Summary and evaluate price and cost by monthly(actual/forcast) ,yearly(budget) l Presentation and report, Monthly cost meeting l Coordinates all quoting activity include collecting all final quotation component. l Maintain Standard cost and price list in system l Set up KPI target team along with company policy,monitoring team's working and solve team's problem to achieve target l Support and plan schedule for special assignment on time target for costing team. l Work cross fuctionally with other department(internal and external) to achieve goals. Achievement Budget Program : Reduce time for collecting data for budget (Standard price, Material cost,Outsource,Design hour) by VBA code program. The step reduction more than 80% from last time.Increses accuracy data.Senior Engineering
elevator Co.2017.01-2019.01(2 years)l Design and develop mechanical design system. l Issue data for manufucture mechanical order part. l Preparation design data and detail of Mechanical part l Preparation Installation drawing l Amend and protect mistake was from mechanical design l Assessment mechanical part and operation control system elevator's l Add fuction of work or amend problem at job site. l Control and maintain BOM data,support current model and part data relevant function Achievement Auto Installation Drawing: Automatic create Installation DWG by Auto-CAD Reduce time and step for create installation drawing by Interface Auto-CAD and VBA.Mechanical Design Engineer
Siam-Hitachi elevator Co.,Ltd2014.01-2016.01(2 years)l Review information/Specification as per customer requirement. l Checks plans of building drawings to fitting installation of new passenger lift on the basic of technical document. l Check that safety regulations and building codes are met, and complete service reports verifying l Prepare/review elevator drawing on the basis of the information and instruction provided. l Make necessary calculations for new project design development. Achievement I had chance to training Mechanical design at Japan for 7 months.VEC Design Engineer
Siam-Hitachi elevator Co.,Ltd2012.01-2013.01(a year)l Establish parts and plan timeline for VEC item project. l Calculate cost part for propose to supplier. l Develop standard,Work instruction and technical document for new part reduction. l Cooperate Supplier for specification and limitation of design new part. l Cooperate with internal (Purchase,QA,Production) for specification and limitation of design new part. l Cooperate with Japan side for approve new part (prepare document and clarify technical data) Achievement I had chance to training at Singapore for 6 months (Mechanical design) Training on abroad Singapore- Siam Hitachi ElevatorControl and maintain mechanical design system and BOM Design and develop mechanical design system Create program for Installation DWG (VBA,CAD) Reduce man hour more than 50% ) Viking Life-Saving Equipment Create DWG and document according to client requirment Support production manuafacturing for smooth route Program checking set uo BOM of product
- KAMPITA (NUT)pansiree5@gmail.com
Educational experience
Kasertsart University
engineering
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****4428
pa**@**om
Membership will unlock the resume
Also view