
Naratip Maion
HSE Supervisor
Nationality
Share
Work experience
HSE Supervisor
BlueScope2023.03-2024.03(a year)Project: Solar roof. - Status: Owner. , Trainer, Scaffolding Coordinator - Area Blue scope building factory. Job description Mechanical work. Fabrication and erection metal sheet, steel structure. Unloading/ loading, equipment for erection & fabrications work Installation mounting structure, PV module on roof Piping work Transportations & delivery work Electrical work invertor system. Civil work. Painting work Testing system & finishing work & washing work. SHE activity -Emergency drill/ Fire drill. -Congratulation 50,000-man hours without LTI. Safety award/ Man of the month.HSE Supervisor
BJCHI2022.11-2023.03(5 months)Project: CRIP. - Status: Main contractor. - Area MKK Fabrication work shop. Job description Mechanical work. Fabrication and erection steel structure. Unloading/ loading, Load out module for erection & fabrications work Piping work Transportations & delivery work E&I work Confined space work. Painting work & sand bathing work Testing system & finishing work & washing work before delivery module to Australia SHE activity -Emergency drill/ Fire drill. -Congratulation 4,000,000 man hours without LTI. Safety award/ Man of the month.Project SHE Permit Coordinator
SPCC2014.06-2017.03(3 years)Project: PTTLNG Nongfab Receiving Terminal March 1st 2019 to October 31th 2019. Status: Main contractor Area: jetty offshore, Retaining wall, SWI, SWO and tunnel onshore, support tank area, BOP area and admin area. Job description - Soil boring investigation - Static piles load test - Steel piles driving work and transportation steel piles on barge remove to jetty area - Construction work onshore of retaining wall, seawater out fall pit, seawater intake pit and tunnel work. Head stock of piling work. SHE activity -Emergency drill/ Fire drill. -Congratulation 2,000,000 man hours without LTI. Safety award/ Man of the month. December 1st 2017 – December 31 th 2018 Client name : PTT Global Chemical Plubic Company Limited Project construction management by PTTME Project: EPS expansion 22 KV project : DLN project PTTGC I-1 Mabthaphud Rayong Position: SHE engineer & inspector Status: Project Client (ISBL area) Job Description Work permit in the operation area by audit & advice are everywhere to work. Operation area by monitoring & control to all who are related work & support SHE plant controller. Civil work, piling work, Architect work, finishing work. Piping work (Tie-in) underground line fire water, GTG rout line piping of DLN project. Structure work, cable tray, support steel galvanizes by modification & assembly in the files work. Electrical by pulling cable, splicing cable, grounding system, plugs in & Instrument work Testing system work to do with the transformer, switchgear, ARV, GIS and mechanical work & piping work Scaffolding work (erection, modification, dismantling) & engineer design follow Thai law. Pre-commissioning work & commissioning work. Turnaround & shutdown work to do with the remove out and change new transformer. Hazard identification & risk assessment & work permit system & specific work & attachment files Environmental coordination & following to regulation by everyone in operation area. SHE Activity - SHE special training in the job site following to PTTGC safety rules - B-CARES - Fire & Emergency Due. - Safety awards, Man of the month. - 100,000 Man hours or 230 days without LTI. April’2017 - July’2017 Project construction management by TKIS Project: Pilot plant technology BST Mabthaphud Rayong Position: Acting Site HSE Manager/ Permit coordinator (ISBL & OSBL area) Job Description Civil work new foundation & finishing work in operation area. Piping work (Tie-in) Structure work Electrical & Instrument Testing work (PT, PAUT, RT, Hydro test, Pneumatic test, flushing test) Scaffolding work (erection, modification, dismantling) & engineer design follow Thai law. Pre-commissioning work & commissioning work. Hazard identification & risk assessment & work permit system by coordination & attachment files SHE Activity - SHE special training in the job site - Fire & Emergency Due. - Safety awards, Man of the month. IHI Corporation Project construction management by TGE Project: PTT LNG Expansion Phase 2 PTT LNG Mapthaphud Rayong Position: SHE supervisor, Project inspector scaffold & trainer, SHE officer & commissioning ERT. Status: Main contractor (Tank area) Job Description Civil work (Pilings work, rebar work, foundation base slap, wall & roof concrete, painting work). Mechanical work (Tank erection) Piping work Unloading/ loading shell plate, bottom plate fabrications work. E&I work Insulation work Scaffolding work (erection, modification, dismantling) & engineer design follow Thai law. Confined space work inside tank 3,4, suspended, annular space. Nightshift work (SHE officer). Pre-commissioning work & commissioning work. The requirement from to all company to inspection that scaffolding by following up IRPC regulation & Thai law. This project is allowing BS standard to use in work area. SHE Activity - SHE special training in the job site - 13,000,000 Man Hour without LTI celebrations of PTTLNG phase 2 projects. - Fire & Emergency Due. - Safety awards, Man of the month CUEL (4 mouths) February 2014 – May 2014 Project construction management by JKC Project: ICHTHYS on shore LNG facilities Project CUEL Laemchabang Cholburi Position: Senior HES and IIF coordinator/ Rigging coordinator Job description Civil work. Mechanical work. Unloading/ loading, Load out module for erection & fabrications work Piping work Transportations & delivery work E&I work Confined space work. Painting work & sand bathing work Testing system & finishing work & washing work before delivery module to Australia ES&H Activity - ES&H special training in the job site - 6,000,000 Man Hour without LTI celebrations of ICHTHYS projects. - Fire & Emergency Due. - Safety awards, Man of the month. - IIF promotion work shop. October 2013 – January 2014 POSCO ENGINEERING, .Co.,Ltd Project construction management by LEPCO Project: PI & Turn around MOC Mapthaput Rayong Position: HSE Supervisor Status: Main contractor Job Description Civil work Piping work Machenical work E&I work Confined space work inside the tower, column, reactor, tank Pre-commissioning work In the area including: ARU, OCU, ORU Hot & cold, Cooling tower, Fabrication workshop by innovation& additional & modifying work ES&H Activity - HSE special training in the job site - 500,000 Man Hour celebrations of HTY project. - Fire & Emergency Due. July 2012 - September 2013 Technip Engineering Thailand Project construction Management: FW Project: 7011 HTY Location: Hadyai Songkla Job title: HSE Supervisor/ Specialist : Permit Issuer Coordinator : HSE Trainer/ : Status : Main contractor Job Description - Civil work: Pile driving, Excavation work, Assembly & installation steel structure & structure, Building & Substation 490, Foundation work Tile work & roof of factory& Architect work. (CNT/ TPC/ LMS/ IPC) - Piping work: Underground piping, Assembly & Installation the piping at fabrication shop & on structure including of Pipe bride & Pipe rack & connecting the equipment on SPRC construction site. (K-Thai/ PTT) - Mechanical work: Unloading, Loading, Lifting by mobile crane, that all Equipment to installation on HTY construction site. (TWC) - Electrical & Instrument work. Installation the cable tray/ ladder, pulling electrical cable. Fabrication cable ladder support & to all support E&I system. (PECI/ ATS) - M&E work including FW pipe/ AHU air condition etc. (PECI) - Coating work: Wrapping are underground & holiday tested, Surface preparation & touch up painting color to all support & equipment on HTY construction site. (K-Thai/ PTT) - Insulation work. (PECI) - Pre-commissioning & testing system work. - Scaffold: Erection, Modify, Dismantle on HTY construction site At area BL 100/ 125/ 127/ 133/ 135/ 150/ 212/ 264/ 480/ 481/ 482/ 483/ 484/ 485/ 486/ 487/ 490 in HTY project. ES&H Activity - HSE special training in the job site - PLUSE Training - Find & fixed reward - 6 million Man Hour celebrations of HTY project. - Fire & Emergency Due. March 2012 – June 2012 GS Engineering & Construction Company. Project: IRPC PRP Project. Location: IRPC Plant Rayong Job title: Project Inspector Scaffold : HSE officer Status: Main contractor Job Description Project inspected of scaffold in ISBL working place that all scaffolding of subcontractor to use in work area the company including of: GS Neotech Piping, E&I. Insutech (Fire proved & Insulation work) Thai Wu Re (Structure & platform) SKSC (Grating, Walk way, Guard rail) GSE&C Pre-commissioning. The requirement from to all company to inspection that scaffolding by following up IRPC regulation & Thai law. This project is allowing BS standard to use in work area. Project control & monitoring Safety officer of subcontractor in ISBL area to following up IRPC regulation & Thai law. HSE Activity Safety job observation card Man of the month award Daily HSE Audit & meeting completion 2 million Man Hour celebrations of IRPC PRP project. Fire & Emergency Due. February 2011 – February 2012 Bechtel International Inc. Project construction Management: SPRC Project: Clean fuel Project Location: I-3B Road Mapthapud Industrial Estate Rayong 21150 Job title: ES&H officer/ Specialist (Temporary Facilities Ray Down Area) by main area take responsible : Permit Issuer (Temporary Facilities Ray Down Area) : ES&H Trainer/ IIF and 3Rs Trainer coordinator. : Project Deputy Security Supervisor. Status : Main contractor Job Description - Civil work: Pile driving, Excavation work, Assembly concrete structure & structure, Building Substation No.18, Foundation work. - Piping work: Underground piping, Assembly & Installation the piping at fabrication shop & on structure including of Pipe bride & Pipe rack & connecting the equipment on SPRC construction site. - Mechanical work: Unloading, Loading, Lifting by mobile crane, Crawler crane that all Equipment to installation on SPRC construction site. - Electrical & Instrument work. Installation the cable tray/ ladder, pulling electrical cable. Fabrication cable ladder support & to all support E&I system. - Coating work: Wrapping are underground & holiday tested, Surface preparation & touch up painting color to all support & equipment on SPRC construction site. - Insulation work. (Insutech) - Pre-commissioning work - Scaffold: Erection, Modify, Dismantle on SPRC construction site( Cape east) At WCN/ BSU/ DHTU/ Utility East West, North South Pipe Rack/ Existing East West Pipe Rack. ES&H Activity - SAA Promotion work shop - IIF Promotion work shop - Mr. & Mrs. CFP contest of SPRC clean fuel project. - 3 million Man Hour celebrations of SPRC clean fuel project. - Fire & Emergency Due. September 2010 – February 2011 Unilever Thai holding company. Consultant: SEATEC Engineering Company Project : Ice cream Expansion Project. By B.S.Y construction Company. : Fire protection under roof Project. By Big T Safe company. : New Refrigeration Project. By Patkol Public Company. : New Transformer and Energy Power Project. By US Power company. : New palletizing conveyor Project. By MHS Company. Location : Unilever Thai holding company. Ladkabang Bangkok. Job Title : HSE officer/ coordinator Status : Owner HSE Job Description 1. Operation work - Utility works include RO/ Soft water/ Flow direct/ Water plant Check leak everyday. - Nh3 system/ Compressor air/ cooling tower/ EVAP – con. - Maintenance planning such as Preventive Maintenance compressor/ Disconnect energy power/ Repair pump leak/ value leak etc. 2. Renovation work - Civil work include new loading room and charging area and new transformer building - Architects work inside all the building - M&E work include Piping work/ water supply/ Electrical work - Ground beam and slab/ Steel structure includes fabrication work/ Election steel column/ Election roof truss/ Canopy and siding/ Fire proof paint. - New palletizing conveyor including relocate existing door and install new door/ Insulate wall panel/ insulated ceiling panel/ concert curb inside/ Install wall protection. - Sprinkler system installation work includes Fabrication support and piping/ Installation welding support piping and welding/ Hydro static test/ Nitrogen test/ Install fire alarm and smoke detector - Fire alarm installation work includes installation under roof/ conduit/ power cable. - Duct bang installation by change system/ Air sock Installation in the processing area. - New refrigeration includes Ammonia pipe/ compressor pump/ Cooling tower/ EVAP – CON. - Installation pipe support includes 8”, 10”, and 12” carbon steels such as liquid / hot gas / suction line. - Installation Receiver tank/ Vessel tank follow to the lifting plan before start of work. - Installation new transformer in the new building and energy power - Commissioning and testing process Safety Activity Fire and emergency due Safety award to man of the month. March 2010 – August 2010 Chuchawal Royal Haskoning Company Consultants Architects Engineer PUI Project (DOW) Thai Growth Project Location : Block 55 AIE Mapthapud Rayong Position : HSE officer Status : Consultant HSE Job Description 1. Civil work - Architects work - Land scrapes work - Building/ construction work - Ceiling work - Additional work - Finishing work 2. Mechanical and Electrical work - AHU/ Chiller/ Cooling tower - Pipe rack Installation - Pipe/ structure work - Duct bang work - Wire way/ ladder tray Installation - Energize power to battery and MDB/ UPS room - Commissioning work Safety Award - 1,000,000 Man hour without loss time accident - Man of the month - Suggestion best award each month - Positive gift September 2009 – February 2010 SHI ASIA Company. Location : 99/9 MABKHA NIKHOMPATTANA RAYONG Position : HSE Manager (Mapkha Shop) Job Description Fabrication on the shop MAPKHA 1. Sphere tank. 2. Silo tank. 3. Demineralization tank. 4. Stainless tank (Vessel tank) 5. Piping/ structure work etc. Employees working on the job site 1. GSP#6 site. 2. PTT CHEM 3. DAW Chemical (Thai Growth Project) Transportation planning and working on the road ways There is transportation and clear the traffic on the road To Grow construction area by loaded the silo tank on the Hydraulic low base trailers. (DOOSAN) March 2009 – August 2009 Sam Jin industrial Thailand Company. Project : Jetty development & LNG receiving terminal Location : 7/81I8road MABTAPUD RAYONG 21000 Position : HSE Supervisor Job Description PTT LNG TANK (Diameter 80 meter) 1. Fabrication the roof rafter/ Structure/ Support of tank at shop fabrication. 2. Modify transfer car for moving the roof rafter for installation at tank 1,2. 3. Installation the roof rafter at tank 1,2 by used crawler crane 250 tons for installed and had planed the lifting heavy equipment and calculation work load of material and roof rafter to be can useable to work lifting 4. Erection and welding the roof plate on the roof rafter by had fall protection assign around the big tank to already. 5. Fabrication and erection the top corner plate and welding and grinding 6. Fabrication and erection aluminum suspend deck manhole stiffener. 7. Installation and welding guest hanger rod inside tank. 8. Preparing the air rising for the roof rafter by 3 air compressor for suction the roof rafter rise up go to the top of the tank. Installation and welding the nozzle pipe on the roof rafter and separate type of a nozzle pipe. EtcSafety Engineer
HMC PolymersProject: HMC PP Line 4 Project. April 1st 2020 to September 30th 2022. Status: Owner. : Scaffold Registrar. Area: PP4 Construction are and PP123Existing plant. Job description Work permit in the operation area by audit & advice are everywhere to work. Operation area by monitoring & control to all who are related work & support SHE plant controller. Civil work, piling work, Architect work, finishing work. Piping work (Tie-in) underground line fire water, GTG rout line piping of DLN project. Structure work, cable tray, support steel galvanizes by modification & assembly in the files work. Fabrication and erection steel structure, roof truss, roof ( Metal sheets ) of new and existing factory, ware house. Electrical by pulling cable, splicing cable, grounding system, plugs in & Instrument work Testing system work to do with the transformer, switchgear, ARV, GIS and mechanical work & piping work Scaffolding work control all contractor and registration. (erection, modification, dismantling) & engineer design follow Thai law. Pre-commissioning work & commissioning work. SHE activity -Emergency drill/ Fire drill. -Congratulation 8,000,000 man hours without LTI. Safety award/ Man of the month. ExperienSafety officer and Inspector
BSTProject: Turn Around. January 1st 2020 to March 31th 2020. Status: Owner. Area: Existing plant. Job description SHE activity -Emergency drill/ Fire drill. -Congratulation 3,000,000 man hours without LTI. Safety award/ Man of the month. Experien
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****4111
Membership will unlock the resume
Also view