- HITACHI ENERGY (THAILAND) LIMITED.2022.12-2023.06(7 months)Client : MHI (MITSUBISHI HEAVY INDUSTY) Owner : HINKONG POWER PLANT
- HITACHI ENERGY (THAILAND) Limited2022.10-2022.12(3 months)Client : GPSC Owner : GSPP2-3
- HITACHI ENERGY (THAILAND) Limited2021.09-2022.09(a year)Client : HITACHI ENERGY PGGI 2215 Owner : EQUONOR
- ABB (THAILAND) Limited (PGGI)2019.09-2021.10(2 years)Client : GPSC. Owner : GLOW SPP1
- ABB POWERGRIDS (THAILAND) Limited (PGGI)2020.12-2021.09(10 months)Client : PEA Owner : PTT GC2
SITE MANAGER.
ABB (THAILAND) Limited (PGGI)2019.03-2021.07(2 years)Client : TPIPP CO.,LTD. Owner : TPIPP CO.,LTD Project : 115/22kV TR 50 MVA & 22/6.3 kV TR 25 MVA Installation. : Manage Construction Site Subcontractor follow up schedule plane. : Connection with owner discuss & Clear Issue. : Manage Construction Site QA&QC & Inspector Team and material Progress. : Planning For work & Meeting. : Manage over all on site.- ABB POWERGRIDS (THAILAND) Limited (PGGI)2020.05-2020.12(8 months)Client : KMUTT BANG KHUN TIAN Owner : KMUTT BANG KHUN TIAN
- ABB(THAILAND) Limited (PGGI)2020.03-2020.04(2 months)Client : SCG Owner : SCG
- ABB(THAILAND) Limited (PGGI)2019.12-2020.02(3 months)Client : GLOW ENERGY Owner : GLOW ENERGY
- ABB(THAILAND) Limited (PGGI)2019.07-2019.08(2 months)Client : AJINOMOTO CO.,LTD Owner : AJINOMOTO CO.,LTD
- ABB (THAILAND) Limited (PGGI)2018.09-2019.03(7 months)Client : WESTERN DIGITAL (THAILAND) CO.,LTD (WD). Owner : WESTERN DIGITAL (THAILAND) CO.,LTD (WD)
SITE MANAGER.
ABB (THAILAND) Limited (PGGI)2018.06-2018.09(4 months)Manage Construction Site Subcontractor follow up schedule plane. : Connection with owner discuss & Clear Issue. : Manage Construction Site QA&QC & Inspector Team and material Progress. : Planning For work & Meeting. : Manage over all on site. Client : ABB (THAILAND) Limited (PGGI) Owner : PTT GC2.SITE MANAGER.
Mega Advance Tech Co.,Ltd.2018.02-2018.05(4 months)Manage Construction Site Subcontractor. : Connection with owner discuss & Clear Issue. : Manage Construction Site QA&QC & Inspector Team and material Progress. : Planning For work & Meeting. : Manage over all on site. Client : ABB (THAILAND) Limited (PGGI). Owner : INTEQC FEED.- Mega Advance Tech Co.,Ltd.2017.11-2018.02(4 months)Client : ST Electronic Thailand Co.,Ltd Owner : BTS.
- Mega Advance Tech Co.,Ltd.2017.10-2017.11(2 months)Client : TTG.Thai Turbo Generator Co.,Ltd Owner : SMT Biomass Power Plant
- Mega Advance Tech Co.,Ltd.2017.08-2017.10(3 months)Client : ABB Co.,Ltd Owner : Glow Co.,Ltd
- Mega Advance Tech Co.,Ltd.2017.04-2017.08(5 months)Client : SKW. Sahakarn Wisawakorn Co.,Ltd Owner : TTM.Thailand tobacco monopoly
- Mega Advance Tech Co.,Ltd.2017.01-2017.04(4 months)Client :ABB / Shinopec Engineering Incorporation. Owner : IRPC PUBLIC COMPANY LIMITED.
- Mega Advance Tech Co.,Ltd.2016.01-2017.01(a year)Client : TRC Construction Public Co.,Ltd. Owner : TTM. Trans Thailand Malaysia
Manager
RB. Computer.2009.12-2016.01(6 years)I QA/QC Engineer. : Control Issue –RFI- worked Inspection. : Control QC Team worked Inspection. : Visual Check Continuity Cable Test. : Visual Check and Test PAGA system. : Visual Check and Test lighting system. : Visual Check and Test lightning system. : Visual Check and Test Grounding system. : Visual Check Instrument system worked Inspection. : Visual Check Installation Inspection Analyzer. : Visual Check Inspection Installation Cable Ladder and Tray. : Visual Check Inspection Installation Junction Box and Air Header. : Visual Check Instrument Installation and Pressure Test. : Visual Check Installation Inspection Conduit. : Visual Check Fire & Gas system. : Visual Check Clear Instrument Punch List. : Control For Team technician. : Manage For Sale & Marketing. : Manage For Service & Tack care customer. : Sale Service Computer. : Install Electric System For house and building. : Install CTV System For house and building.Engineer For Bilomatic
Ream & Roll Co.,Ltd.2006.02-2009.12(4 years)Supervise For process cutting paper From big roll To A4. : Checking For PLC Cabinet control systemSALE Engineer
VIBOON Co.,Ltd.2004.04-2006.01(2 years)Open the new market For Product. : Follow up the old customer. Page 10 of 18 Page 11 of 18 Page 12 of 18 Page 13 of 18 Page 14 of 18 Page 15 of 18 Page 16 of 18 Page 17 of 18 Page 18 of 18- HITACHI ENERGY (THAILAND) LIMITED.Client : SIAM YAMATO STEEL (SYS1) Owner : SIAM YAMATO STEEL (SYS1)
Projects
115 KV NEW SUBSTATION (GIS) SYS-MTP
Hinkong
115 KV GIS NORTH BUS
DOGGER BANK A
PTT GC2 EPS3 PROJECT
KMUTT 69/22 KV Substation PROJECT
MOCGTG PROJECT
MOCD2 PROJECT
GLOW ENERGY KT51A RELOCATION PROJECT
GLOW CARVE SPP1 PROJECT
AJI PTT PML KANGAROO PROJECT
115/22kV Indoor Substation.
EPS
115/22 KV INTEQC FEED Substation Project
Cable Dressing DCU and Slave
SMT Biomass Power Plant 9.4 MW Project
Power Supply for Limestone Unit Project
DIET PLANT Project
PPE. Polypropelene lll Expansion
New Incinerator Project.
Educational experience
Rajamangala Institute Of Technology
Majer Electrical Engineering-Telecommunication Engineering.2000.01-2004.01(4 years)Nakhornsrithammarat technical college
Electronic1997.01-2000.01(3 years)
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****2247
Ad**@**om
Membership will unlock the resume
Also view