Judy

Instrument and Controls Engineer
Live in United StatesNationality
Share

Work experience

  • Instrument and Controls Engineer

    BYK Additives & Instruments
    2019.09-2021.11(2 years)
    Main Achievements: • Improved the new Garmite DeltaV DCS programs. • Improved Allen Bradley PLC programs (using Studio 5000 and RSLogix500). • Configured the current (Amps) displays for all drives at the new Garmite plant. • Added all analog and discrete tags to data software Axiom for the new Garmite plant and some old processes.
  • Controls Engineer

    LSI - Logical Systems Inc.
    2017.12-2019.07(2 years)
    Worked on DeltaV DCS programs, instrumentation and PLC projects. Main Achievements: • Completed DeltaV Batch Programming for an organic chemical plant. • Completed SHN DeltaV Support & Optimization service for large brewery. • Completed the loop test for a big Rockwell PLC project for a large petroleum transfer facility. • Finished the Translation from Chinese to English to let American colleagues to help China office to finish a big project (MES). • Designed instrumentations and loop tested the control Cabinets (RockwellPLC) for process cooling water system.
  • Instrumentation & Electrical & Controls Engineer II, DeltaV administrator

    Ashland
    2010.05-2017.12(8 years)
    Responsible for I&C daily maintenance and projects and ITPM for the electrical safety. •DeltaV DCS, DeltaV SIS, Siemens PLC, instruments, and electrical controls System and electrical power systems. •Draft and implement I&C PM plan,I&C spare parts and inventory control. Cost saving. Maintain I&C documentation and records. • Technical support and training for E&I technicians. • Manage outside maintenance contractors for instrumentations(FIKE etc.) • Lead EI&C improvement projects related to EHS and production, support plant capital projects. • In charge of internal and external calibration of instrumentation devices. • Aspen administrator, responsible for Aspen maintenance and troubleshooting. • DeltaV DCS and SIS system administrator, responsible for DeltaV maintenance, troubleshooting, and Programming. Main Achievements: • Finished the instrumentation and DeltaV DCS system hardware selection and DeltaV DCS configuration and programming by myself and led FAT, loop test, PSSR, commissioning and start up for Decanter C (chemical process) Project. • Finished the instrumentation and DeltaV DCS system hardware selection, DCS configuration and programming by myself and Led the FAT, loop test, commissioning, and start up for Alkali and Ethanol Mixture Cooler Project. • Led the audit for instrumentation and DeltaV DCS design, checked the instrumentation and DCS installation, took part in FAT, led the instrumentation loop test, PSSR, commissioning and start up for CMCII Expansion Project. • Finished the instrumentation and DeltaV DCS system hardware selection, DCS configuration and programming by myself and led the installation, loop test, FAT, PSSR, commissioning and start up for Grinder Line E Project. • Finished the instrumentation and DeltaV DCS hardware selection, configuration and programming by myself, Led the installation, loop test, FAT, PSSR, commissioning and start up for MCA System (chemical process) Project. • Added the data points to Data Software Aspen.
  • Instrumentation Engineer

    BrightOil 光汇石油集团
    2008.10-2009.12(a year)
    In charge of the design of instrument systems, selecting the instruments, technical clarification, and compiling contracts for new projects. The new projects included: six gas stations, petroleum depots, and wharves in Shenzhen. In charge of instrument systems project management, including installation, loop tests, and commissioning. In charge of the instrument, control, and device (e.g. servo valves) upgrade projects for the existing petroleum depot and wharf in Shenzhen. Main Achievements: • Completed CCTV upgrade project, added 35 monitors. • Completed four big advertisement boards project using LED and neon lights. • Completed the wire connections and commissioning for remote control valves. • Completed verification of the electrical and instrument control systems design for six gas stations. • Completed power distribution system upgrade project of fuel distribution wharf and trucking center, ~100 million gallons storage.
  • Mechanical and Electrical Teacher

    Guangxi Wuzhou Agricultural/ Technical School
    2003.09-2007.08(4 years)
    • Taught: Electrotechnics, Electrical work, Electrical Control Principles, Programmable Logical Control system (PLC), Mechanical Drawing, AutoCAD 2004, Mechanical foundations, computer English etc. Was named as outstanding teacher in the 2005~2006 and 2006~2007 school years. • Established the PLC Training Room, led the PLC training for my students. • Established the electrical work training room, Led the electrical work training for my students.
  • Instrumentation and Controls Engineer

    Heda Pulp & Paper Co. Ltd
    1993.07-2003.09(10 years)
    • In charge of technological support for instrument systems, including the installation, calibration, and commissioning of new electrical devices, instrument and control systems, troubleshooting instrument control systems, etc. • In charge of the maintenance for PLC control systems. • In charge of major overhaul project lasting a half month every year. This included compiling the repair plan, purchasing materials and parts in advance, implementing the plan, organizing and coordinating personnel to complete the project within limited time. • Worked as a leader of instrument maintenance team for several years, in charge of instrumentation control systems’ maintenance, repair, overhaul, and upgrade. • Trained the electrical and instrumentation technicians on electrical and instrument control systems and equipment, including the principles of measurement, equipment for measuring the level, pressure, flow, temperature, pulp density (density of a slurry), etc; principles of valves and their troubleshooting; PLC principles, configuration, and troubleshooting; electrical relay control system principles, configuration, and troubleshooting. Main Achievements: • Took part in the instrument control system installation, loop tests, and commissioning when the plant was initially built. • Completed an upgrade project in 2001. In charge of the control systems upgrade. Upgraded conventional control systems to PLC control systems (Siemens S7-300, Allen- Bradley SLC-500). • Responsible for completing routine maintenance work.

Educational experience

  • South China University of Technology

    MBA
    2007.01-2009.01(2 years)
  • Guangxi University

    English Language and Literature/letters
    2003.01-2009.01(6 years)
  • Jiangnan University

    Industrial Electrical Automation
    1989.01-1993.01(4 years)

Certificates

Certified Six Sigma Green Belt DeltaV 7009 DeltaV Operate Implementation I PME101 Aspen InfoPlus.21: Real Time Information Management Foundation 7016 DeltaV Systems Batch Implementation
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me