John Paul Espinosa

MaleQuality Inspector/TesterLive in Saudi ArabiaNationality Philippines
Share

Work experience

  • Telecommunications QC Inspector

    Naizak Global Engineering System
    2022.11-Current(4 years)
    Project: Security Support Facilities Project Package 5 - Tanajib, Saudi Arabia Client: Saudi Aramco (ISP/OSP and Security) Duration: November 2, 2022 up to present • Prepared and submitted Security Inspection Test Plans (ITP) and inspection checklists in accordance with Saudi Aramco Engineering Standards (SAES-O), project specifications, contracts, and schedules. • Prepared and maintained required quality records, including drafting and submitting Non- Conformance Reports (NCR) to the QC Supervisor when necessary. • Conducted installation inspections on completed materials and equipment prior to testing and pre- commissioning activities, ensuring proper documentation of tests, controls, and inspections. • Performed quality inspections for Outside Plant (OSP) activities, including fiber optic cable pulling, sealing of ducts and subducts, installation of 4-inch, 3-inch, and 2-inch PVC conduits for road crossings, and commissioning verification through mandrel testing. • Conducted quality inspections for the installation of security devices associated with industrial security facility systems, ensuring compliance with project specifications, SAES-O standards, and approved installation procedures. Intrusion Detection and Alarm System (IDAS) Long Range Detection and Alarm System (LRDAS) Security Access Control System (SACS) Automatic License Plate Recognition System (ALPRS) Microwave Intrusion Detection System (MIDS), Micropoint Sensor Cabling system Closed Circuit Television System (CCTV). John Paul U. Espinosa Curriculum Vitae
  • QC Supervisor

    Naizak Global Engineering System
    2018.10-2022.08(4 years)
    Project: Vessel Traffic Management Information System - Jizan, Saudi Arabia Client: Saudi Aramco (Telecommunications / E&I) Duration: October 24, 2018 up to August 22, 2022 • Preparing progress reports for the number of RFI’s on a weekly basis and sends it to the QC manager. • Monitoring the schedules of inspections for Telecommunications and E&I QC inspectors on a daily basis. • Reviewing and Compiling of the Internal Non-Conformance Reports from QC inspectors and following up with the construction for the resolutions and status of the INCR’s prior to the Agreed Completion dates.
  • Construction Supervisor

    Naizak Global Engineering System
    2015.05-2016.03(a year)
    Project: Rabigh II - Non Processed Buildings - Rabigh, Saudi Arabia Client: Saudi Arabian Baytur/ AKON International John Paul U. Espinosa Duration: May 30, 2015 up to March 23, 2016 • Executes the specific task of man power handling and distribution. Planning of work as per two week look ahead schedule. • Qualified and certified Structured Cabling System cable installer through Systimax / Commscope which includes permanent link testing of terminated cables. • Qualified Mechanical Installer of Cable ladders and accessories from CPI Chatsworth. • Knows how to interpret drawings and lay outs. • Responsible to provide red line mark-up drawings if possible as per site change and condition. • Responsible for making daily, weekly and monthly reports. • Checking the work conformity with the Quality Control Plan, obtain the relevant documentation, and check procedures and equipment to be used in tests, controls and inspections, manage documents certifying tests, controls and inspections
  • Telecommunications QC Inspector

    Naizak Global Engineering System
    2015.04-2015.05(a month)
    Project: Shaybah NGL Power Generation Project – SCADA Network - Shaybah Saudi Arabia Client: Saudi Aramco • Executes the specific inspections on materials, equipment and construction/installation activities on site. • Check conformity with the Quality Control Plan, obtain the relevant documentation, and check procedures and equipment to be used in tests, controls and inspections, manage documents certifying tests, controls and inspections.
  • Telecommunications QC Inspector

    Naizak Global Engineering System
    2013.02-2014.08(2 years)
    Project: King Abdullah Sports City - Jeddah, Saudi Arabia Client: Samsung SDS • Prepared and submitted Inspection Test Plans (ITP) and inspection checklists in accordance with international standards, project specifications, contracts, and schedules. • Conducted material receiving inspections for incoming materials and equipment prior to site installation, ensuring compliance with project specifications and Quality Control Plans. • Issued relevant quality records and prepared Non-Conformance Reports (NCR) when required, submitting findings to the QC Supervisor for corrective action. • Performed installation inspections on completed works prior to testing and pre-commissioning activities to verify compliance with approved standards and specifications. • Verified conformity with Quality Control Plans by reviewing procedures, inspection methods, testing equipment, and maintaining documentation related to inspections, tests, and quality controls. • Coordinated inspection hold points requiring joint witness by proponents and project inspectors during installation, testing, and pre-commissioning phases. • Conducted inspection, verification, and closure of rectified punch list items to ensure completion in accordance with project requirements.
  • Telecommunications QC Inspector

    Naizak Global Engineering Systems
    2011.10-2012.11(a year)
    Project: King Abdullah Petroleum Studies and Research Center - Riyadh, Saudi Arabia Client: Drake and Scull International • Conducts detailed inspections of materials, equipment, and construction/installation activities on site to ensure compliance with project requirements. John Paul U. Espinosa Curriculum Vitae • Reviews project scope, work limitations, and Issued for Construction (IFC) drawings; performs equipment and material receiving inspections in accordance with purchase specifications, applicable standards, and SAES-T requirements. • Prepares quality inspection reports and issues Non-Conformance Reports (NCR) when required to address deviations from specifications and standards.
  • Telecommunications Technician

    Naizak Global Engineering Systems
    2010.09-2011.10(a year)
    Project: Replacement of Data Network Equipment (RDNE) – BI 0074 Client: STESA THALES (Team Leader – Northern Area) • Supervises the construction activities on site as per IFC drawings. • Responsible for evaluation and implementation of the installation procedure as per the applicable standards. • Responsible for Opening and Closing Work Permit from Saudi Aramco Work Permit issuer. • Preparing Reports of progress to be submitted daily to the construction manager. • Experienced in the installation of electrical equipment, materials, power cables, and conduit accessories, ensuring all items are used according to specification requirements prior to installation.
  • Telecommunications Technician

    Naizak Global Engineering Systems
    2010.02-2010.09(8 months)
    Project: Upstream Professional Development Center – (UPDC) Dhahran, Saudi Arabia Client: Drake and Scull International • Mechanical installation of Passive Equipment. • Cable pulling, dressing, termination from outlet and patch panels. • UTP Cable testing with the Fluke Cable Analyzer • Completion of EIL punch-list
  • Technician

    Naizak Global Engineering Systems
    2009.04-2009.10(7 months)
    Project: King Abdullah University of Science and Technology - Jeddah, Saudi Arabia (Saudi Aramco) Client: SUMITOMO CORP. • Installation of UPS and Batteries for all Telecom rooms in KAUST. (1 KVA – 10 KVA) • Installation of all supply cables from Power panel to UPS • Pre-commissioning of UPS and Battery System with proponent. • Ensure all work and tests undertaken are in accordance with the Specifications and manufacturers instruction.

Educational experience

  • STI College

    Computer Technology
    2002.01-2005.01(3 years)

Languages

English
Fluent
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me