Derik Tan Kian
Technical Support Engineer (Vision Division)
After-sales technical supportLive in MalaysiaNationality
Share
Work experience
Technical Support Engineer (Vision Division)
KEYENCE Malaysia2023.01-Current(3 years)(2 years 4 months) Job scope • Involving in vision project testing and project proposal. • Deal with sales team / customer based on the customer requirement (minimum detectable size, field of view, lighting selection, line speed and alsothe mechanical design when collaborate with OEM). • Generate testing detail report based on sample testing for customer review. • Mainly support on vision application (Defect checking, measurement application, OCR (Character Recognition tools) and 1D/2D code checking. • Site testing at customer site and showcase customer about the project performance expectation and workability. • Travel to customer site for vision system installation / setup. Make sure the program works stable after installation and trial run. • Give technical training to customer after the vision system inspection work well and stable. • Generate manual book to customer after the technical training. • Support when customer faced the issue regarding vision system (Includingtravel to customer site and remote support). • Give recommendation to customer when they have any questions about vision and also the vision program.Production Engineer
Top Glove2020.10-2022.10(2 years)(2 years 1 month) Job scope • Manage on the Auto-stacking machine, robotic arm machine and compressor system of whole factory supply • Prepare the data analysis by using graph/ table weekly for the department • Daily basis on manages team project to follow up during downline planning and troubleshooting on daily issue • Propose and report improvement plan to achieve the torn glove%&machine efficiency target. • Familiar with machine mechanism such as working follow of chain, bearing parts and shaft. In additional, the pneumatic system, sensor and servo drive program. • Involving redesign by using CAD to do improvement on the machine. Besides, strong hands – on skills to do welding & wiring job for the project. •Study & apply the AI vision system on the glove defect detection. Improvement project • Manage to reduce down the torn glove from 1% to below 0.5% during my service period • Increase the machine efficiency by design top press that able to reduce the former rotation and also increase the pre-shipment passing rate of production. • Auto oiling project that able to reduce the manpower cost and oil the chain more accurate without excessive. • Proposed and install the air jet nozzle that able to save production cost. • Install and modify Individual sensor in the chain system that able to increase the machine efficiency. Project management • Discussion with supplier for the project and propose to superior with relevant ROI. • Involving over RM 1 million huge maintenance project (Chain overhaul of thewhole production line within the targeted period to prevent output loss). • Installation of the auto stacking machine by using Gantt chart during the limited downline period.
Educational experience
Universiti Teknikal Malaysia Melaka
Mechanical Engineering2016.08-2020.08(4 years)
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
de**@**om
Membership will unlock the resume
Also view