Commissioning Technical Advisor
Spencer Ogden2024.09-2025.03(7 months)FFF Abukuma Wind project (GE Vernova) 147 MW , Fukushima JapanCommissioning Technical Advisor
Spencer Ogden2023.12-2024.03(4 months)Ishikari Hachinosawa Wind project (GE Vernova) 21 MW , Hokkaido JapanWTG Engineer- Engineering and Construction Department
Monsoon wind power company Ltd. 600 MW wind farm project in Laos PDR2023.04-2023.10(7 months)Review WTG drawing, installation manual, instructions specific to the project - Ensure EPC contractor follows approved document for WTG component preparations and installation activities - Oversee and manage installation activities, ensuring adherence to project schedules, quality standards, and safety regulations. - Closely monitor quality of work with EPC contractor and issue Non-conformance report (NCR) when is necessary - Witness and participate in WTG inspection and commissioning process - Discuss and agree on WTG punch-list with relevant parties - Attend site meeting for any WTG related issue or as per request - Work with multi-disciplinary team to identify project risks, barriers, issues and propose possible solutions and mitigation strategies - Coordinate with site HSE team to ensure the work activities are under safety procedure and project requirements - Responsible to ensure any parties before working at WTG complies with PPE requirement. - planning and managing scope, time, budget, and resources for supervising the WTG commissioning activities carried out by the WTG contractor and other sub- contractors to ensure contract complianceElectrical Engineer
International Line Commissioning2022.07-2023.03(9 months)Brueckner Group Asia Pacific - Supervising in electrical installation and commissioning of Brückner Lines - Overseeing inspection, maintenance, and upgrade of Brückner Lines - Troubleshooting - Handling of electrical service as requested - Provides technical support and training to the customers - Creating technical documents and maintain records /or electrical project manager overseas - Perform activities in line with standard Operating Procedures, coordination plan rules, and customer rules in Thailand and Asia Pacific Project - PT. Trias Sentosa. Surabaya Indonesia Oct. 2022- Dec. 2022Wind commissioning Technical Field Advisor
FieldCore a GE Company2017.02-2022.06(5 years)Directly responsible for the Site Wind Commissioning activities from project mobilization through customer acceptance of last unit - Review and implement all applicable commissioning documents and processes and verify technical compliance during all phases of Wind Turbine commissioning - Monitor compliance of the Commissioning test documents with a minimum of one daily visit to each of the onsite activities. - Evaluate, mentor and develop prospective Commissioning leads - Attend weekly Commissioning Meetings and disseminate all information to subordinates at the site level - Ensures personnel have the necessary tools and procedures for work during Start Up & Commissioning - Ensure Job Site Books containing Commissioning checklists and inspections are 100% completed and accurate - Interface with Engineering and P&S Technical Field Operations management as required to support project issues affecting Commissioning activities - Adhere to and/or implement Safety Procedures/protocols issued to the site that affect scope of responsibilities in accordance with the Wind EHS Outage Plan - Participates in LOTO process as required/directed - Comply with all Quality Processes - Assigns daily tasks and supervises personnel performing onsite commissioning activities - Interfaces with the customer when necessary on commissioning activities - Coordinates daily commissioning activities on site. Effectively manage available site resources to ensure successful completion of the contractual obligations - Ensures corrective action is taken to fix all problems that impact Turbine Completion - Provides information for E-DSR, where required - Responsible for all administrative work during activity Wind Farm project experience: Lam Ta khong Wind Turbine Project Stage 2 :2X-2.0MW 116@94m HH 12 turbines 24 MW. Nakhon Ratchasima Thailand. June 2017 – November 2017 Ohorayama Wind farm Project :3X-3.2MW 103 11 turbines 33 MW. Kochi Prefecture Japan. November 2017 – February 2018 T1-Thepharak Wind Project: 30 turbines 90 MW. NKS-Krissana Wind Power Project: 30 turbines 90 MW. T4-K.R.One Project: 30 turbines 90 MW. 3X-3.0 MW 137 @ 156.5m HH Nakhon Ratchasima Thailand. March 2018 – June 2019 Tay Nguyen Wind Project Stage I: 2X-2.4 MW 116@94m HH Dak Lak province Vietnam August 2019 – September 2019 T4-K.R.One Project: Punch list verification and Blade stud cleaning jobs Nakhon Ratchasima Thailand. October 2019 – December 2019 Tay Nguyen Wind Project Stage I: 2X-2.4 MW 116@94m HH ,12 turbines Dak Lak province Vietnam. September 2020 – October 2020 Phoung Mai 1 Wind Project : 2X-2.4 MW 116@94m HH, 11 turbines Binh Dinh province Vietnam. April 2021 – October 2021 Cau Dat wind Project:4MW 137@ 111.5 m HH 15unit. Lâm Đồng province Vietnam October 2021 – December 2021Maintenance Tech (Maintenance Supv.) HWO 460K Department
Emas Energy Services (Thailand) Ltd2015.06-2016.07(a year)Working Schedule: 4 weeks On/4weeks Off (Offshore) Offshore services experience : Jasmine Field. B5/27.WP-D Mubadala Petroleum. Jasmine Field. B5/27.WP-C Mubadala Petroleum. Jasmine Field. B5/27.WP-B Mubadala Petroleum. Jasmine Field. B5/27.WP-A Mubadala Petroleum. Manora Field. Block G1/48.WP-A Mubadala Petroleum. - Install and maintain wiring , lighting systems, communication system (Gai-tronics &Internet) , E&I device, hydraulic hose, ESP, C-pump, Low voltage system. - Assist mechanic to service HPU, Generator set, Air compressor, mud pump (diesel engine). - Inspect electrical components, such as transformers , circuit breakers, control panel, Generator set , Hydraulic power Unit Electric motor, Electric submersible pump , BOP control system (Koomey type’80), Air compressor , Air conditioner. - Perform TPM and break down Maintenance to ensure that there is no effect on operation plan. - investigating problems, diagnosing/repairing faults - Determines material, equipment, and supplies to be used manage Spare part and Cost Control. - Maintain all equipment manuals, equipment warranties, and tool inventories. - Assisted in HWO activities, verified and procured equipment or services, and performed various engineering functions as required - Responsible for working on various electrical needs as well as designing electrical circuits for special applications (controllers etc.) and troubleshooting problem on electrical system including PLC and zone II experience proof circuits. - Maintain equipment, facilities and auxiliary equipment/tool in a cost effective and safe manner. - Operate with electrical meters and tools, mechanic’s hand and power tools, drill press, power saws, sheet metal tools, heavy equipment, electrical equipment and machinery. - Maintenance equipment in good condition and taking preventive measures against any spill. - Follow maintenance schedule and repair any faults immediately. - To work primarily at offshore and land based well site locations and on occasions at the company and client facilities. - Comply with the Employer’s quality, safety, environmental management systems and procedures to ensure all duties are executed in a safe manner minimizing harm to the environment. - Ensure that unit/equipment specific procedures are reviewed as appropriate to ensure that work instructions are clearly understood and implemented. - Ensure that the Employer’s assets are operated and maintained in accordance and with OEM (Original Equipment Manufacturer) and the procedures whilst at the well site and during onshore trials. - Ensure that a high standard of housekeeping is maintained throughout the operation including mobilization and backload of equipment. - Ensure that all incidents are reported in line with the procedure and Client policy and assist where necessary with close out of incidents. - Performs such other duties as assigned by the supervisor/ManagerElectronic Tech
Electronic Tech2013.04-2015.01(2 years)Internal Equipment Maintenance Department, Halliburton Energy Services INC. Electronic Equipment :Process Controller and Safety Device Pressure and Flow transducer, Gas detector, Signal cable , Unipro II, Compupac , FLECS, Micro Motion, Magnetic pick up, PLCs and HMI Siemens , Pyroban’s Offshore Safety System, Motor control Box ,lighting equipment. - Maintain electronic instrumentation from offshore job. - Prepare electronic equipment for offshore job. - Performing scheduled preventative maintenance work. - Preventative maintenance of electronic and electro-mechanical equipment. - Perform basic operations using test equipment and industrial controllers required to test and calibrate equipment. - Installing control and measurement instruments on existing or new plant equipment. - Inspecting and testing the operation of instruments and systems to diagnose faults using testing devices. - Troubleshooting process control devices such as PLCs, HMI Control Panel , Network connecting devices Machine and Engine: Electric air Compressor , Submersible Pump1bpm,4bpm,5bpm,10bpm, HT-400 Pump, Generator set 50 KVA,100 KVA, Nitrogen converter Pump, 44L Pump. Coil tubing unit (Control house), Cementing unit Diesel engine electrical system: Detroit , Cummins, Caterpillar Transmission Allison : Transmission Control Module (TCM) - PM, RPM and run test to find out its performance by using electronic tools. - To check and repair engine electrical system. - Troubleshooting and Calibrating process equipment on Cementing unit such as PLCs, Micro Motion, RCM cement mixing system, Transmission system of Allison, Control Panel - Installing and Calibrating process equipment on Coil tubing unit such as Injector Pull Test, Zone II equipment ( pressurized system, Gas Detector, Smoke& heat Detector) - Preform Recertify Zone II Unit such as Electric air Compressor, Generator set, Coil tubing unit (Control house) Onshore experience : Thailand- PTTEP Lan Krabue S1(Sand Control) Offshore experience : Thailand - Guft of Thailand :T15,T16,Siam Driller Ao-thai (Cementing) Vietnam – PVD5, Ocean Quest Rig, KNOC Rong Doi West tucana rig (Cementing &Coil tubing) Working Schedule: 4 weeks On/2weeksElectrical Engineer 4
rovincial WatPerworks Authority Region 9 Chiang Mai2012.06-2013.03(10 months)Provincial Waterworks Authority Region 9 Chiang Mai - Plans and directs activities concerned with water utility systems installation, operation, maintenance, and service - Provides engineering and technical direction for planning and design of water utility projects. - Prepares budget estimates based on anticipated material and personnel needs - Prepare and study technical drawings, specifications of electrical systems, and topographical maps to ensure that installation and operations conform to standardsLecturer to Division of Electrical Engineering
Rajamangala University of Technology Lanna2008.10-2012.06(4 years)Prepare and conduct lessons according to the course syllabus - Provide necessary supervision to the students - Feedback to School Management about class performance - Make all coursework and assessment papers - writing research proposals, papers and other publications - Other duties as assigned whenever necessaryCalibration and control Systems Supervisor
Siam Food2002.07-2004.01(2 years)Product PCL., - Manage and control daily production process in the area of responsibility as well as work closely and interact with all departments throughout the manufacturing processes. - Perform TPM and break down Maintenance on instrumentation PLC, sensor , Transmitter and pneumatic systems - Maintain production equipment by implementing maintenance standards - to ensure calibration and maintenance activities are addressed and carried out in a timely and accurate - Provide operational data collection to support and implement Continuous Improvements. - Provide troubleshooting, analytical and technical expertise in manufacturing issues, process start-up and process implementation of new or modified equipment - Monitor and control production process to ensure compliance of ISO9001, ISO14001, GMP System and OHSAS18001. - Provide support to the department for improving product quality.
Educational experience
learning Center
Energy2022.09-2022.10(a month)Chiang Mai University
Master of Engineering2001.04-2001.05(2 months)Institute of technology
Engineering
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
66****9499
Ch**@**om
Membership will unlock the resume
Also view