Daikin Airconditioning (Singapore) Pte. Ltd.2024.06-Current(2 years)(2 years 3 months) SingaporeProject Engineer
CHEN GUAN AIR CONDITIONING & ENGINEERING SDN BHD2021.12-2024.06(3 years)(2 years 7 months) (Taiyo Yuden Kuching Sarawak - Package 29 M&E Work) (HO: Oct 2023) 1.PIC for ACMV control system & BMS systems. 2.To liaise with main contractor and other sub-contractors. 3.To validate SLD, power & control schematic of control panel. 4. To prepare wiring diagram for sensors and equipment. 5. To validate IO List, control logic, IO diagram & etc. 6. To check and validate quotations from contractors. 7. To attend FAT of control panels. 8. To prepare for RFI,WMS O&M. 9. To integrating BMS with ACMV system & other services. 10. Perform T&C for ACMV equipment.Project Engineer
Warisan Jati Engineering Sdn Bhd2021.07-2021.12(6 months)(KVLRT3 Package GS05 - 132/33kV Bulk Supply Substation) 1. To prepare monthly progress claim and identify VO. 2. To prepare Shop Drawing and As-Built Drawing submission. 3. To attend weekly site walk with main contractor and client. 4. To raise RFI/SIR for all the work done in the site. 5. To prepare Work Method Statement and Material Submission Approval. 6. To prepare Operation & Manual before project handover. 7. To response to Document/Drawing Review Comment Sheet (DRS) from consultant. 8. To estimate costs of materials and work done for Bill of Quantity(tender). 9. To prepare project scheduling ahead prior to project execution.Application Engineer
Hitachi Sunway Information Systems2020.02-2021.07(a year)(1 year 6 months) 1. To provide technical support and coaching to the new or existing Zuken customers. 2. To be responsible for demo/seminar/webinar to enhance customers' experience and satisfaction. 3. To be responsible for ECAD and MCAD product listing. 4. To analyze customer requirements and propose suitable engineering solution. 5. Conduct training and after sales service to the clients.M&E Engineering Intern
OCK Setia Eng Sdn Bhd2019.01-2019.03(3 months)1. To assist site engineer to develop working and coordination drawing for execution. 2. To assist drafter to modify drawing as per required by the customer or project team. (AutoCAD) 3. To carry out administration tasks. 4. To assist costing engineer for tendering document and catalog finding. 5. To liaise with consultant at site for M&E work progress and drawing.Customer Engagement Specialist
Resource Entity Sdn Bhd2018.01-2018.03(3 months)1. To approach potential new customer by cold-calling. 2. Consistently seek new product knowledge to act an export for the customers. 3. To achieve daily and monthly sales target as set.Pet Care Professional
Pets More Sdn Bhd2017.01-2017.03(3 months)1. To serve and assist customers. 2. To assist in daily routine of pet shop's operation.
Educational experience
Taylor's University
Electrical and Electronics Engineering2016.01-2019.01(3 years)
Certificates
CIDB License
Graduate Technologist
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
ro**@**om
Membership will unlock the resume
Also view