Yun Shen

Service engineer
MaleAfter-sales technical supportLive in MalaysiaNationality
Share

Work experience

  • Service engineer

    ENR ENGINEERING CORPORATION
    2021.09-Current(4 years)
    Specialization Engineering - Electronics/Communication Role Electronics Engineer Position Level Senior Executive Monthly Salary USD 1700 Support setup : laser marking machine laser cutting machine RF plasma machine wafer plasma machine To attend commissioning / warranty / service jobs. To attend on-board inspections,debugging. To attend projects for new products evaluation test together with customer. Evaluate the condition and perform failure analysis on equipment Work with engineering team to provide design and manufacturing improvements. customer :- Intel, AMS Osram, ASE, Inari, NXP, Nexperia project handle :- · spray coating process improvement process for increase the uph yield and cost saving. - dispensing using vermes pump with function needle instead of using nozzle for jetting for phosphor material and low density epoxy. · laser cut device size 700x700 panel. · laser mark device on full Q panel size 212x216 · involved on the design idea feedback to R&D headquarter which RF plasma process for the device need contact angle leadframe bottom need get below less the 10 degree angle.
  • service engineer

    avante technology and services
    2010.06-Current(15 years)
    Specialization Engineering - Mechanical/Automotive Role Technician/Support Position Level Senior Executive To attend commissioning / warranty / service jobs. To attend on-board inspections,debugging. To attend projects for new products evaluation test together with customer To support sales activities as and when required. current customer based :-- OSRAM SEMICONDUCTOR , PHILIPS LUMILEDS ,AMD,ESCATEC (DISPENSING , SPRAYCASTING ,CASTING ,UNDERFILL PROCESS) PROJECT HANDLE:-- -- developed and evaluated new product and the process together with customer R&D project team from beginning to the production stage. -- handle the projected spray coating process for customer OSRAM ,LUMILEDS as replacement for some product to replace the layer transfer process. -- handle the projected underfill process on the TFAMD
  • technician

    ASM Technology Singapore Pte Ltd
    2007.06-2010.01(3 years)
    Specialization Engineering - Electrical Role Electrical Technician/Support Position Level Non-Executive · machine assembly for wire bonding machine · setup and calibration for the wire bonding machine · modify & parts installation due to customer request
  • Electrical Technician

    Bromma (m) sdn bhd
    2003.05-2007.03(4 years)
    Specialization Engineering - Electrical Role Electrical Technician/Support Position Level Non-Executive Monthly Salary MYR 1,800 · electrical parts and cable installation · electrical cabinet wiring · sensors calibration and adjustment · spreader functioning testing and troubleshooting

Educational experience

  • perak institute of engineering technology

    Mechatronic
    2000.01-2003.01(3 years)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me