SANPARIT

Bangkok Metropolitan AreaNationality
Share

Work experience

  • Project Manager Execution, South East Asia & Pacific

    Sidel
    2023.12-Current(2 years)
  • Freelance Interpreter/Translator

    Self-employed
    2020.01-Current(6 years)
    - consecutive interpretation, ENG<->TH + specialize in business/engineering/manufacturing topics + on-stage/onsite/video conference interpretation, experienced in audit/road show/seminar/training/trade fair events.- translation (ENG<->TH) + specialize in training/technical/user manual/website translation- >10 years of corporate world communication skill in field of engineering, project management, customer service, know-how transfer, management field.
  • Engineering & Project Management Consultant

    Self-employed
    2020.01-2023.11(4 years)
    - plant start-up study project (metal formwork & scaffolding): + conduct feasibility study & production/operation cost estimation + define organisation structure and man-power requirement + define machine requirement & plant layout + product design engineering consultant- plant start-up execution project (metal formwork & scaffolding): + serve as acting plant manager + recruit, train & coach all plant resources (engineering, planing, purchasing, production, warehouse staff) + define production / stock management / purchasing work process + selection and launch of plant ERP
  • Industrial Project Manager

    Essilor
    2019.04-2019.12(9 months)
    - responsible for large scale industrial projects, Asia Region. (production capacity transfer, efficiency improvement) - define project scope (equipment, schedule, budget, competency) together with stakeholders - conduct project feasibility study & business case. - lead global multi-disciplinary team to execute project. (product design, engineering, purchasing, production, supply chain) and steer project through various project “Stage Gates” - alignment with regional HS&E be in compliance with requirements - lead project risk analysis / FMEA and manage risk mitigation measures/plan - regular project status update/alignment with regional and global management.
  • Head of Project Management & Engineering

    WIFAG//POLYTYPE GROUP
    2017.01-2019.03(2 years)
    INDUSTRY: PRINTING/PACKAGING MACHINERY- manage/coach a team of project managers, mech., elec. SW and service engineers (15 team members)- responsible for customer plastic cup&tube printing machine projects and internal global part & company supply projects (assembled in Thai plant, >300M THB/year turnover)- plan and manage pre-order fabrication and assembly in plant’s pipe line together with production- pre-project costing and schedule plan for sales- manage service engineer team service requests and scheduling- provide technical support for sales and after-sales- lead design improvement projects (standardization, cost saving) in close coordination with global design team- lead customer specific design scope- check and approve all drawings and technical specification sheets created in Thailand- responsible for design change management and coordination of required actions (doc. update, management of old parts in stock and within pipeline, communication with production, assembly and supplier)
  • Project & Engineering Manager

    WIFAG//POLYTYPE GROUP
    2015.07-2016.12(2 years)
    INDUSTRY: PRINTING/PACKAGING MACHINERY- responsible for machine production transfer from German to Thai plant. (aluminum tube machines) + manage know-how transfer from German plant + lead design localization and migration of drawing package into SAP. (2 designers as direct reports) + compile and execute sourcing strategy together with purchasing. + plan, lead and control assembly of pilot machine + cost, schedule and quality controlling- responsible for machine production in Thai plant (plastic cup&tube printing machines, assembled in Thai plant) + create internal order from customer’s purchasing contract (mech. spec., schedule, etc.) + plan, lead and control execution (design, purchasing, assembly, logistics, service eng., accounting) + point of contact for customer, arrange with/for them transportation, installation, commissioning, acceptance test, payments and other special requests (test runs, certificate of origin, packing list, B/L, training info etc.) + cost, schedule and quality controlling- connect and improve communication between Thai and European subsidiaries.
  • Project Manager

    WIFAG//POLYTYPE GROUP
    2013.02-2015.06(2 years)
    INDUSTRY: PRINTING/PACKAGING MACHINERY- responsible for turn-key aluminum bottle/can/tube production line (>5MM Euro/project)- create internal order from customer’s purchasing contract (mech. spec., schedule, etc.)- clarify details with customer, confirm layout and project specific designs, align delivery and installation schedule- plan, lead, coordinate and control execution with external machine suppliers, internal operations (project specific design, internal machine fabrication, logistics, commercial documentation, installation- specify and initiate orders for external supplier’s machines, clarify tech. details, conduct acceptance test- manage changes during project execution- project single point of contact during execution both internal & external- manage, follow-up installation open-point list to have all solved for acceptance by customer- compile training package for customerprovide technical support, line layout, cost estimate for sales and customer service.- attend trade fairs to build relationship and contact with customers.
  • Project Engineer, Packaging

    Procter & Gamble
    2011.01-2012.12(2 years)
    INDUSTRY: FMCG/HEALTHCARE/PACKAGING MACHINERY- responsible for packaging solution projects- create conceptual study and compile technical specification definition of packaging solutions- manage contracted equipment manufacturer for project scope (cost negotiation, design reviews, tests runs, documentation)- plan, lead and coordinate test runs at customer plant, installation and commissioning of pilot packaging solution.
  • Project Engineer, Electrical

    Procter & Gamble
    2008.02-2010.12(3 years)
    INDUSTRY: FMCG/HEALTHCARE/Diapers Production Line (PAMPERS baby diapers)- responsible for improvement/modification of standard production line within 5 European plants.- manage contractors for engineering work, part delivery/logistics tracking and installation.- plan, lead and coordinate execution (installation instructions, purchasing, training, installation, solving open-points)- manage eng. changes throughout project life-cycle and reapply learnings among plants.
  • Research Student (Master Degree)

    ABB Corporate Research
    2007.04-2007.10(7 months)
    INDUSTRIES: ROBOTICS- Designed and implemented software for robot programming by motion and speech.- System Integrategration. (mechanical hardware, electrical hardware & software)

Educational experience

  • Technische Universität Hamburg-Harburg

    Mechatronics, master of science (msc)
  • Northern Institute of Technology

    Technology Management master of business administration (mba)
  • Chulalongkorn University

    Mechanical Engineering bachelor of engineering (beng)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me