Sakchai

Chonburi, Chon BuriNationality
Share

Work experience

  • GT Inlet & Exhaust Duct Inspection

    Global plan service Co.,Ltd.
    2021.12-Current(4 years)
    Assignment and responsibility are inspection and Expediting on behalf of Mitsubishi Hitachi Power Systems-MHI Japan
  • QA/QC Supervisor

    Vogt Power International
    2021.01-2021.11(a year)
  • Pressure Test Inspector (Test Package Team Lead)

    CUEL Limited
    2020.08-2020.11(4 months)
    ExxonMobil BLADE Project ISBL
  • QA/QC Supervisor

    Bureau Veritas SA
    2020.02-2020.06(5 months)
    VINYTHAI Project
  • QA/QC Supervisor

    Toyo Engineering Corporation
    2019.08-2020.01(6 months)
    Project Name : BST EXPANSION PROJECT
  • Tisco QC Inspector

    Vogt Power International
    2018.07-2019.01(7 months)
  • Materials and QC Supervisor

    Toshiba Plant Systems & Services Corp (TPSC Engineering)
    2016.09-2018.06(2 years)
  • QC Supervisor

    IBCI CONSULTING
    2016.04-2016.08(5 months)
    Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.
  • QA/QC Inspector

    Samsung C&T, Engineering & Construction Group
    2015.03-2016.02(a year)
    Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.
  • QA/QC Inspector

    Laing ORourke
    2013.09-2015.03(2 years)
    Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.
  • QA/QC Inspector

    AI Authorize Inspection
    2013.06-2013.09(4 months)
    * Reviewed to the scope of work, work schedule, ITP, WPS, PQR, WQT and other procedure * Enforcing the implementation of the HSE rules. * Assistance to sub-contractors for work preparation. * Monitoring the quality of the fabrication and erection work. * Checking the progress of the work as reported by the sub-contractors. * Monitoring the traceability of bulk materials. * Provide technical expertise to site and project management. * Responsible for planning and mobilization of worker. * Solving technical queries raised by sub-contractors. * In the workshop, expediting fabrication as per the priorities requested by the field. * Coordination of field activities with other trades. * Expertise punch list clearing and completion of the works. * Confirmation checking before pressure testing. * Responsible for reinstatement works after pressure testing and mechanical completion. * Prepare pre-commissioning works. * To perform line check, witness of line test and final walk down with client. * Perform and preparation for Tie In Point during mechanical day. * Reviewed to the manufacturer dossier record
  • QA/QC Inspector

    RCR Tomlinson
    2012.12-2013.06(7 months)
    Assignment issued for supervise and maintaining overall documentation and handover final MDR’s including controlling of completion status i.e. submittal, reviewed, approved, and record keeping. Final considered inspection and testing reports accordingly as per Inspection and test plan (ITP) to be correct and Completed are in accordance with project Requirement such as materials inspection, weld procedure, welder qualified, welding control records, visual and dimension reports, NDE reports and procedure, painting inspection, final inspection and inspection release note are also included. Complete of final inspection book copies with scan disc scan for client handover.
  • QC Supervisor (Tisco)

    Vogt Power International
    2008.01-2012.12(5 years)
    Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.
  • QC/NDT Supervisor

    RMS Quality Company Limited
    2007.05-2007.12(8 months)
    Co-ordinate with owner Inspector to certify inspection as regarding dimensional , alignment , elevation , high strength bolt and painting. Witnessed WQT application and quality control of welder & welding program.
  • Piping Inspector

    Qualitech Engineering and Construction Co., Ltd.
    2006.06-2007.04(a year)
    Ensure that quality and quantity of all welding and welder are implement in accordance with project specification. Perform of welder qualification test and reviewed examination result for NDT testing.
  • Welding Inspector

    NASCO-HIAP SENG Engineering Co., Ltd.
    2006.02-2006.05(4 months)
    Preparation for inspection sequent and system for all of blast/coats work include supporting document and MDR. Make sure the materials are acceptable with conform to specification requirement before release to painting. Coordinate between shop fabricated and site erected to ensure that priority to be available
  • QA/QC Engineer

    ASI System Integration, Inc.
    2005.02-2006.01(a year)
    Ensure that quality control system including certification that are supporting document for each offsite fabricator. Supervise that cast steel materials are implementation in accordance with drawing and specification. Management for all of inspection as on site erected such as survey data, assembly, visual welding, reviewed NDT testing up to final inspection and maintain record. Certified and reviewed to complete the MDR for hand over to owner.
  • QC Inspector

    KAMA Joint Venture Co.,Ltd.,
    2004.03-2005.01(a year)
    Perform verification the quality control system including certification that are supporting document for each offsite fabricator. Ensure that cast steel materials are implementation in accordance with drawing and specification. Control all of inspection for on site erected such as survey data, assembly, visual welding, reviewed NDT testing up to final inspection and maintain record. Prepared and reviewed to complete the MDR for hand over to client (TCS/NBIA).
  • QC Technician

    THAI ROTARY ENGINEERING PUBLIC COMPANY LIMITED
    2000.01-2004.02(4 years)
    Ensure that quality and quantity of all welding and welder are implement in accordance with project specification. Perform of welder qualification test and reviewed examination result for NDT testing.
  • NDT Technician

    ETG Construction and Development Co., Ltd.
    1998.09-1999.07(a year)
    Perform of all nondestructive testing and verify that welding are implement and accordance with method statement for NDT testing.
  • QC Inspector

    BEC-PRO CO., LTD
    1997.02-1997.08(7 months)
    Ensure that all item inspection to correct with in the tolerance, acceptance criteria and accordance with procedure. Assist owner inspector all of quality control for field inspection and maintain recording for NDT Testing.
  • QC Inspector

    PAE (Thailand) CO.,LTD
    1996.10-1997.02(5 months)
    Co-ordinate with owner Inspector to certify inspection as regarding dimensional , alignment , elevation , high strength bolt and painting. Witnessed WQT application and quality control of welder & welding program.
  • QC Inspector

    TNS Construction & Development CO.,LTD
    1995.11-1996.10(a year)
    Review supporting document of quality control and maintain record keeping. Perform dimensional inspection for all of steel structure work. Prepare application request for inspection schedule and submit to client inspector.
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me