Sakchai
Chonburi, Chon BuriNationality
Share
Work experience
GT Inlet & Exhaust Duct Inspection
Global plan service Co.,Ltd.2021.12-Current(4 years)Assignment and responsibility are inspection and Expediting on behalf of Mitsubishi Hitachi Power Systems-MHI JapanQA/QC Supervisor
Vogt Power International2021.01-2021.11(a year)Pressure Test Inspector (Test Package Team Lead)
CUEL Limited2020.08-2020.11(4 months)ExxonMobil BLADE Project ISBLQA/QC Supervisor
Bureau Veritas SA2020.02-2020.06(5 months)VINYTHAI ProjectQA/QC Supervisor
Toyo Engineering Corporation2019.08-2020.01(6 months)Project Name : BST EXPANSION PROJECTTisco QC Inspector
Vogt Power International2018.07-2019.01(7 months)Materials and QC Supervisor
Toshiba Plant Systems & Services Corp (TPSC Engineering)2016.09-2018.06(2 years)QC Supervisor
IBCI CONSULTING2016.04-2016.08(5 months)Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.QA/QC Inspector
Samsung C&T, Engineering & Construction Group2015.03-2016.02(a year)Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.QA/QC Inspector
Laing ORourke2013.09-2015.03(2 years)Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.QA/QC Inspector
AI Authorize Inspection2013.06-2013.09(4 months)* Reviewed to the scope of work, work schedule, ITP, WPS, PQR, WQT and other procedure * Enforcing the implementation of the HSE rules. * Assistance to sub-contractors for work preparation. * Monitoring the quality of the fabrication and erection work. * Checking the progress of the work as reported by the sub-contractors. * Monitoring the traceability of bulk materials. * Provide technical expertise to site and project management. * Responsible for planning and mobilization of worker. * Solving technical queries raised by sub-contractors. * In the workshop, expediting fabrication as per the priorities requested by the field. * Coordination of field activities with other trades. * Expertise punch list clearing and completion of the works. * Confirmation checking before pressure testing. * Responsible for reinstatement works after pressure testing and mechanical completion. * Prepare pre-commissioning works. * To perform line check, witness of line test and final walk down with client. * Perform and preparation for Tie In Point during mechanical day. * Reviewed to the manufacturer dossier recordQA/QC Inspector
RCR Tomlinson2012.12-2013.06(7 months)Assignment issued for supervise and maintaining overall documentation and handover final MDR’s including controlling of completion status i.e. submittal, reviewed, approved, and record keeping. Final considered inspection and testing reports accordingly as per Inspection and test plan (ITP) to be correct and Completed are in accordance with project Requirement such as materials inspection, weld procedure, welder qualified, welding control records, visual and dimension reports, NDE reports and procedure, painting inspection, final inspection and inspection release note are also included. Complete of final inspection book copies with scan disc scan for client handover.QC Supervisor (Tisco)
Vogt Power International2008.01-2012.12(5 years)Supervise and management for all of quality control programs and system such as materials, welding, visual & dimensional, Nondestructive testing hydrostatic test included protective blast/coats etc. Ensure that welding procedure (WPS&PQR) include welders qualification (WQT&WPQR) are implement conformed in accordance as per project specific required with complies to international code.Maintain for the supporting documentation and testing report include final acceptance with verify were perform to conformed in accordance with specification with record keeping for final handover.QC/NDT Supervisor
RMS Quality Company Limited2007.05-2007.12(8 months)Co-ordinate with owner Inspector to certify inspection as regarding dimensional , alignment , elevation , high strength bolt and painting. Witnessed WQT application and quality control of welder & welding program.Piping Inspector
Qualitech Engineering and Construction Co., Ltd.2006.06-2007.04(a year)Ensure that quality and quantity of all welding and welder are implement in accordance with project specification. Perform of welder qualification test and reviewed examination result for NDT testing.Welding Inspector
NASCO-HIAP SENG Engineering Co., Ltd.2006.02-2006.05(4 months)Preparation for inspection sequent and system for all of blast/coats work include supporting document and MDR. Make sure the materials are acceptable with conform to specification requirement before release to painting. Coordinate between shop fabricated and site erected to ensure that priority to be availableQA/QC Engineer
ASI System Integration, Inc.2005.02-2006.01(a year)Ensure that quality control system including certification that are supporting document for each offsite fabricator. Supervise that cast steel materials are implementation in accordance with drawing and specification. Management for all of inspection as on site erected such as survey data, assembly, visual welding, reviewed NDT testing up to final inspection and maintain record. Certified and reviewed to complete the MDR for hand over to owner.QC Inspector
KAMA Joint Venture Co.,Ltd.,2004.03-2005.01(a year)Perform verification the quality control system including certification that are supporting document for each offsite fabricator. Ensure that cast steel materials are implementation in accordance with drawing and specification. Control all of inspection for on site erected such as survey data, assembly, visual welding, reviewed NDT testing up to final inspection and maintain record. Prepared and reviewed to complete the MDR for hand over to client (TCS/NBIA).QC Technician
THAI ROTARY ENGINEERING PUBLIC COMPANY LIMITED2000.01-2004.02(4 years)Ensure that quality and quantity of all welding and welder are implement in accordance with project specification. Perform of welder qualification test and reviewed examination result for NDT testing.NDT Technician
ETG Construction and Development Co., Ltd.1998.09-1999.07(a year)Perform of all nondestructive testing and verify that welding are implement and accordance with method statement for NDT testing.QC Inspector
BEC-PRO CO., LTD1997.02-1997.08(7 months)Ensure that all item inspection to correct with in the tolerance, acceptance criteria and accordance with procedure. Assist owner inspector all of quality control for field inspection and maintain recording for NDT Testing.QC Inspector
PAE (Thailand) CO.,LTD1996.10-1997.02(5 months)Co-ordinate with owner Inspector to certify inspection as regarding dimensional , alignment , elevation , high strength bolt and painting. Witnessed WQT application and quality control of welder & welding program.QC Inspector
TNS Construction & Development CO.,LTD1995.11-1996.10(a year)Review supporting document of quality control and maintain record keeping. Perform dimensional inspection for all of steel structure work. Prepare application request for inspection schedule and submit to client inspector.
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
Membership will unlock the resume
Also view