
Mr. Auten
Nationality
Share
Work experience
GSP#7
CPP-CPPB-Big Gas Joint Venture (China Petroleum)2023.01-Current(3 years)IN PIPELINESafety officer
CPP-CPPB-Big Gas Joint Venture (China Petroleum)2023.01-2024.01(a year)professional level Project Name : GSP#7 Project Owner : PTT Responsibility : 1. Prepare and carry out an emergency plan to help victims of height disasters. 2. Create and implement an emergency plan. Help victims of working at heights 3. Prepare JSA for GCME/PTT owners. 4. Prepare documents and coordinate Loading Test Crane with GCME /PTT. 5. Prepare and coordinate inspections of machinery and electrical appliances. 6. Create a plan and coordinate training for GCME/PTT employees. 7. Prepare a plan and provide safety equipment. 8. Prepare an accident investigation report and prepare measures to prevent recurrence. 9. Coordinate meeting with GCME /PTT 10. Organize an activity to talk about cartoons before starting the event. 11. Prepare a report. 12. Prepare a plan for opening a work permit and send information to PTT (Page 6 of 11) PROFESSIONAL EXPERIENCESGSPLM P2 D210
3.PTT Khao2022.01-2023.01(a year)Safety Manager
LCBSTRR2022.01-2023.01(a year)- Allchem Trans solution Co., Ltd.2021.06-2022.06(a year)(1 year) 1 year
Senior Safety Manager
All chem Trans solution Co., Ltd2021.06-2022.06(a year)Project Name : - Project Owner : Thai Asahi Chemicals Responsibility : 1.CHECK THE PICK-UP LOCATION AND DELIVERY LOCATION BEFORE SENDING CHEMICALS. 2.ORGANIZE A ROUTE SURVEY SAFETY CONDITIONS BEFORETRANSPORTATION 3.EXAMINE THE DRIVING BEHAVIOR OF EMPLOYEES NOT EXCEEDING THE SPEED SPECIFIED BY LAW. 4.CHECK GPS CONTROLLER LET EMPLOYEES TRAVEL TO DELIVER GOODS ALONG THE SPECIFIED ROUTE. 5.MEASURE THE ALCOHOL OF EMPLOYEES. BOTH BEFORE AND AFTER WORK 6.CHECK FOR DRUGS 7.PREPARE AN EMERGENCY PLAN AND PRACTICE. 8.PREPARE AN EMERGENCY PLAN AND PRACTICE RECOVERY IN CASE OF A CHEMICAL LEAK FROM A TRANSPORT VEHICLE. 9.CHECK THE CONDITION OF THE CAR AND SAFETY EQUIPMENT MONTHLY. 10.MAKE A REPORT RELATED SAFETY OFFICERS 11.CHECK AND TEST THE EMERGENCY PUMP. USED FOR RECOVERING FROM CHEMICAL SPILLS 12.PREPARE DAILY REPORTS IN THE TRANSPORTATION OF CHEMICALS SPEED CONTROL CHEMICAL LOADING (Page 8 of 11) PROFESSIONAL EXPERIENCESsafety officer High
Liang Chemical2017.03-2020.07(3 years)Project Name : - Project Owner : - Responsibility : 1.PREPARE PLANS AND ASSESS SAFETY 2.PREPARE REGISTRATION AND MONITOR LEGAL PROCEEDINGS. 3.PREPARE A REPORT FOR THE PPP 4.TRAIN EMPLOYEES AND CONTRACTORS BEFORE STARTING WORK. 5.TOONBOXTALK EVENT 6.MAKE A PLAN AND COORDINATE THE MEASUREMENT OF THE WORKING ENVIRONMENT, LIGHT, SOUND, HEAT. 7.PREPARE A REPORT FOR THE SOR KOR. 8.MAKE A REPORT FOR SOR. 9.PREPARE A REPORT OF THE MINISTRY OF FOREIGN AFFAIRS. 10.PREPARE WORK PLANS AND MONITORING DOCUMENTS RELATED TO THE ENTIRE ISO14001 SYSTEM. (Page 9 of 11) PROFESSIONAL EXPERIENCESsafety officer technical level
master solution2015.07-2017.03(2 years)Engineering
Sino thai2014.03-2015.07(a year)1 year 3 month (Page 2 of 11)safety officer
Sino thai Engineering and Construction2014.03-2015.07(a year)SEPARATION PLANT
2.PTT KHAOPRESENT 1 year5month
Projects
GSPLM P2 D210
power plant
power plant
Educational experience
Sukhothai Thammathirat Open University
Occupational Health and SafetyRamkhamhaeng University
Political
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
Au**@**om
Membership will unlock the resume
Also view