Mostafa

facade team leader
MaleProject Manager/SupervisorLive in Saudi ArabiaNationality
Share

Work experience

  • facade team leader

    BUNA|ALeading General Contractor
    2024.03-2026.04(2 years)
    (2 years 2 months) -Key person between the main contractor (Buna) and the façade sub- contractor (Shenyang Yuanda Aluminum Industry Engineering Company) -Liaised with consultants for all façade work submittals, material approvals, and proposal evaluations, ensuring compliance with project specifications. -Managed all façade-related submissions (IR, MIR, MAR, RFI) and coordinated with the consultant to ensure compliance with project specifications. -Supervised on-site façade installation, ensuring adherence to the project schedule and safety standards. -Led QA/QC processes for façade installations, including inspections, material testing, and compliance reviews to meet project specifications. -Developed and implemented façade work plans, coordinating with mechanical and electrical departments for seamless integration. -Prepared official letters related to façade work and provided technical insights to the project director. -Oversee the testing, commissioning, and final inspections of the façade.
  • Senior Facade Engineer

    CSCEC Egypt
    2023.07-2024.03(9 months)
    -Member of Façade Department Team at CMO: Played a pivotal role in overseeing all façade work within the Central Business District (CBD) project. -Gathered and evaluated information from multiple suppliers, including those for aluminum, glass, stone, and other façade-related materials. -Engaged directly with suppliers to obtain detailed specifications and samples, ensuring materials met project requirements. -Collaborated with team members to assess various product alternatives, selecting the most suitable options to align with project goals and standards. -Conducted daily follow-ups with subcontractors to monitor the façade installation process, ensuring adherence to timelines and quality standards. -Attending meetings with owner representatives and recording their comments -Prepared comprehensive snag lists for subcontractors, facilitating a smooth and efficient project handover process.
  • Senior Site Engineer

    Alico Egypt for Aluminum
    2022.02-2023.07(a year)
    4 years 2 months (1 year 6 months) -Oversee and manage the installation of aluminum work on-site, including stick and unitized curtain walls, handrails, cladding, louvers, honeycomb columns, and skylights. -Coordinate daily manpower of supervisors, fitters, and laborers, ensuring efficient distribution based on site priorities. -Monitor supervisors' installation progress to ensure timely and accurate execution. -Ensure all work aligns with shop drawings and meets required specifications. -Collaborate with the main contractor for logistical needs, including the use of tower cranes and mobile cranes for panel lifting. -Supervise contractor work when outsourced, ensuring compliance with project standards. -Resolve installation issues promptly to prevent material wastage. -Submit completed work to the quality control engineer, addressing any feedback to ensure final approval.
  • Project Engineer

    Alico Egypt for Aluminum
    2019.11-2022.02(2 years)
    (2 years 4 months) -Review site requirements for materials and indentations. -Coordinate with the purchasing department to ensure site needs are met. -Follow up with the materials department regarding the availability of raw materials. -Monitor design releases for new work orders based on site requirements. -Liaise with the quantity surveyor regarding any client-requested variations orders. -Oversee the coordination of site equipment, such as trucks and forklifts, to maximize efficiency.
  • External Fabrication Engineer

    Alico Egypt for Aluminum
    2019.06-2019.11(6 months)
    -Fabrication and supervision of honeycomb workshops work -Manage the workshops work. -Follow up with site to fabricate columns according to site priority. -Reporting about aluminum crates fabrication issue -Ensure having enough needed raw materials. -Daily report with workshops progress -Submit work to quality control engineer.
  • Roads Engineer

    Badr company for construction
    2019.02-2019.05(4 months)
    -Execution and improving efficacy of roads at fifth settlement. -Execution roads the subbase, base, surface, and asphalt -Submit IR to consultant.
  • Roads Engineer

    Egyptian Armed Forces
    2017.12-2018.12(a year)
    (1 year 1 month) • Supervised and executed road engineering projects in New Alamein City, overseeing the construction of subbase, base, surface, and asphalt. • Managed the implementation of road surveys and laboratory work by companies like Orascom and Rowed Modern Engineering (RME).
  • Trainee Site Engineer

    The Arab Contractors
    2016.08-2016.09(2 months)

Educational experience

  • Arab Academy for Science, Technology and Maritime Transport

    construction and building Engineering
    2012.01-2017.01(5 years)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me