Liyong

Engineer and project leader in marine equipment | Translation specialist in language services
Male34 y/oEnglish TranslationLive in DaLianNationality China
Share

Summary

[Looking for opportunities for remote collaboration (or temporarily on-site work) to support your CAD software translation, though remote work may not be included in the requirements in your recruitment list] Freelance Translator & Editor | Marine Engineer Engineering, Medical, Technology Localization | Full-Cycle EN-ZH/ZH-EN Translation Solutions 5+ Years Translation Experience | 10+ Years Engineering Expertise

Work experience

  • Engineer and project leader in marine equipment

    China State Shipbuilding Corporation (Dalian)
    2016.05-2023.06(7 years)
    Technical focus: Key technologies across industrial manufacturing, including fluid, structure, electrical, mechanical, IT, energy Main products: LNG type-C independent storage tank for COSCO T300K-91 vessel; LNG type-B independent storage tank for MSC C16K container ship Skills: Project management; Product development from scratch; Integrating R&D and marketing; Expertise in 2D/3D CAD software (Autodesk CAD, Solidworks, Ansys); Skillful in coding (Matlab, MS Office VBA)

Projects

  • Language services with 100+ projects (See CV)

    Freelance Translator
    2023.09-Current(2 years)
    From shipbuilding engineer to language specialist, combining technical expertise with linguistic precision to deliver high-accuracy EN-ZH translation solutions for medical devices, engineering documentation, and localization projects.
  • LNG type-B independent storage tank for MSC C16K container ship

    Engineer and project leader
    2022.03-2023.06(a year)
    This 366-m vessel is equipped with the world’s largest B-type LNG fuel tank (13,000 m³) and marks a breakthrough with its fully self-developed LNG fuel tank technology, closing a critical tech gap in China.
  • LNG type-C independent storage tank for COSCO T300K-91 vessel

    Engineer and project leader
    2019.01-2021.12(3 years)
    The LNG gas storage system adopts a Type C tank design, with one LNG refueling station on each side (port and starboard), each featuring a Type C 3,500 m³ cryogenic LNG storage tank as the main component. The refueling rate reaches 1,500 m³/hour, facilitating efficient bunkering operations for shipowner. Through this project, CSSC (Dalian) has achieved breakthroughs in key technologies, including the independent design of cryogenic Type C LNG tanks, high-precision construction, tank assembly and integration, and testing.

Educational experience

  • Tianjin University

    School of Civil Engineering
    2009.09-2016.01(6 years)
    Research focus: Engineering design, system reliability analysis, engineering decision

Languages

English
Proficient
Chinese (Mandarin)
Native

Certificates

CATTI III
2018.11
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me