Adrian Edson

Electrical Project Assistant
Male23 y/oProject Specialist/Assistant/Implementation Engineer/Energy Project ManagementLive in PeruNationality Peru
Share

Work experience

  • Electrical Project Assistant

    Sepcon SAC
    2025.02-Current(7 months)
    • Participation in the installation, design, and transport of 4 LPG gas compressors (2 phases). • Drafting and reviewing electrical drawings and single-line diagrams in AutoCAD. • Design of the electrical system for the workers' camp "Nuevo Mundo" (Low Voltage). • Planning the future power supply for the "Kinteroni" camp. • Calculation and design of electrical panels and lighting systems. • Support in the installation and planning of internal project circuits and instrumentation. • Preparation of technical reports and document management. • Sizing of cables, lightning rods, electrical loads, and grounding systems (Low Voltage).

Projects

  • RECAPEX II

    Asisstant on Instruments and Electric Loads / Human Resources/ Project Management
    2025.02-Current(7 months)
    Assembly of four compression units, interconnection to existing systems, and auxiliary services for Repsol's gas processing plant in La Convención Province, Cusco. The objective is to build a compressor plant (U-400) to increase the pressure of natural gas for transportation through the pipeline, with a compression capacity of approximately 268 MMSCFD.

Educational experience

  • Universidad Nacional Mayor de San Marcos

    ELECTRICAL ENGINEERING
    2020.08-Current(5 years)
    I'm not graduated yet, but I will be the next year.

Languages

Spanish
Native
English
Proficient
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me