Leon

Lead Project Manager
MaleProject Manager/SupervisorLive in AustraliaNationality
Share

Work experience

  • Lead Project Manager

    Vestas
    2024.04-Current(2 years)
    Experience (1 year 6 months)
  • Project Manager

    Vestas
    2020.10-2024.04(4 years)
    (3 years 7 months)
  • Lead Project Engineer

    GE Renewable Energy
    2017.11-2020.10(3 years)
    Lead Project Engineer for Australia's largest wind farm - Coopers Gap Wind Farm. The Coopers Gap Wind Farm will have a capacity 453 MW and produce around 1,510,000 MWh of renewable energy, powering more than 260,000 average Australian homes. Consisting 123 GE wind turbine generators. Role Responsibilities: - OEM (GE) Lead Project Engineer for EPC contract - Project management of supply, transportation, erection, fit-out and commissioning of 123 wind turbine generators. This was the largest wind farm in Australia by MW at completion of the project.
  • Project Engineer - Whiteside

    Rio Tinto
    2016.01-2017.10(2 years)
    5 years 10 months (1 year 10 months) Responsibilities: • Implementation and scope management of area capital projects • Scope management of major equipment inspection and repairs • Implementation of operation improvement projects • In-service inspection of piping, pressure vessel and tanks • Calciner Shutdown Refractory Inspection • Facilitation of risk assessment, constructbility review and HAZOP Key Projects: • Spent Liquor Pipeline Replacement • Caustic Cleaning of Disk Filter Chute • Spent Liquor Pipeline Major Repair • Precipitation Tank Repairs • Caustic Cleaning Heat Exchangers Repairs • Caustic Cleaning Pipeline Major Inspection & Repair • Vacuum Pump Gearbox Cooling Water Line Upgrade • Neutralization Tank Bypass
  • Mechanical Integrity Engineer

    Rio Tinto
    2014.10-2016.01(a year)
    (1 year 4 months) Responsibilities: • Facilitate and Implement RBI of Pressure Vessel/Pressure Piping/Tanks • Produce Inspection Standards for Pressure Vessels/Piping/Tanks • Produce Annual Pressure Equipment Shutdown Scopes • Perform Fitness for Service Assessments (API 579 Level1&2) • Facilitation of API 579 Level 3 FFS Assessment • Project management and implementation of Advanced NDT Inspection (Online High Temp PAUT, LRUT) • Management of site Statutory Equipment • Management of Authority to Operate on non-conformance equipment • Process Safety – KPI Reporting • Process Safety – Building Engulfment Modelling • Shutdown Shift Support Engineer
  • Mechanical Project Engineer

    Rio Tinto
    2013.05-2014.10(a year)
    (1 year 6 months) Responsibilities: • Mechanical design for CAPEX and OPEX projects • Design review and risk assessment of new project • HAZOP studies for plant upgrade • Produce Engineering Technical Specification and Scope of Works Documents for projects • Produce Equipment Data Sheet for tender • Engineering calculations for Mechanical Piping, Pumping and Pressure Safety Valve • Development and review of P&ID and PFD • Site Engineering standard updates in compliance to relevant AS/API/ASME standards • CAPEX and OPEX Project Management Key Projects: • Acid Tank Replacement • Baseplate Jig Removal • First Flush Pumping System • Instrument Air System Upgrade • Bitumen Sealing Installation
  • Mechanical Engineer - Redside Maintenance

    Rio Tinto
    2012.09-2013.04(8 months)
    • Daily Engineering support for operations and maintenance team • Design and Implementation of Safety Improvements Projects • Plant shut down inspection • Statutory Pressure Safety Valve (PSV) Inspection • Statutory Structural and Civil Audits • Pressure Vessel/Equipment Management • Contractor Management for Onsite Maintenance Repair
  • Mechanical Engineer - Whiteside Reliability

    Rio Tinto
    2012.01-2012.09(9 months)
    • Facilitate Root Cause Analysis • Cost Benefit Analysis for Defect Elimination • SAP data analysis for potential defect analysis projects • Implement Reliability Improvement Projects • Review and development of preventative maintenance strategies in SAP • Reliability Centred Management (RCM) • Reversed RCM • Conditional Monitoring Data Analysis (NDT, VA)
  • Chassis Release Writer

    PACCAR
    2008.01-2009.02(a year)
    (1 year 2 months) • Chassis definition of new sales orders • Definition of prototype chassis • Bill of Material (BOM) maintenance / update • Chassis design on Pro/Engineer

Educational experience

  • Swinburne University of Technology

    Advanced Manufacturing technology
    2011.01-2011.01
  • Monash University

    Mechanical Engineering
    2005.01-2010.01(5 years)
  • Monash University

    Mathematics
    2005.01-2010.01(5 years)
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me