Egor

Drilling Department manager
Male34 y/oOthersLive in RussiaNationality Russia
Share

Summary

Drilling Manager with 12 + experience in drilling. Experienced with Drillmec MR-8000, ARS-225, ZJ-20, ZJ-30, ZJ-40, DR 3200/200, DR 4500, DR 200 drilling rigs. Participated in the drilling of production and injection wells with a depth of 0 to 15000 ft at the Samotlor, Mamontovsky, Priobskoye, Malobalyk, Variogan fields; have a deep knowledge of In drilling rig kinematics equipment (drilling winch, angle reducer, power drives, top-drive systems), drilling pumps 9Т-800 Drillmec, 8Т-650, MP-10 Weatherford, PZ-7 Canada, F-800, F-1000, F-1600, LGF-800. My personal experience is connected with the jamming of a well during the release of a mixture of oil and gas at the site 50 of the Variogan field, the use of laser technology for cutting metal structures of a drilling rig. I’ve been working in an international environment, demonstrated exceptional adaptability to various roles, teams and requirements. For the period 2016-2020, I have been promoted from Drilling Assistant to Drilling Department Manager.

Work experience

  • Drilling Department manager

    Rosneft
    2020.10-Current(5 years)
    Manage drilling process of oil and gas wells: 4 Projects, 20 Rigs,0–4500 Depths; Making a depth-day schedule for the well wiring; Making presentation materials on the quality of work of drilling crews; Participating in the commissioning of drilling equipment after installation work. This resulted in a 20% reduction in unproductive time; Control the submission of applications for equipment and materials on a daily basis; Ensure timely delivery to the customer of the volume of work performed with the provision of relevant documents; To date, I am the chairman of the commission for checking the knowledge of personnel in the field of industrial safety; For two years in a row I have been a member of the commission for checking the professional skills of drilling crews; Monitor on a daily basis the transmission of reports from drilling crews; On a weekly basis, I conduct inspections of drilling crews to assess the state of working conditions, which reduced injuries at the production facility by 50%; Make shift schedules for shift personnel; Participated in the development of labor protection instructions; Сheck the compliance of contractors with the terms of contracts; Developed and implemented a new schematic diagram of the location of the equipment of the circulation system of the Drillmec MR-8000 drilling rig at the Samotlor site. This reduced the cost of drilling fluid chemicals by 30%.
  • Rig Superintendent

    Rosneft
    2017.07-2020.10(3 years)
    Supervised the production activities of the drilling crew (40 persons); Carried out control over the movement and storage of material assets and fixed assets; Conducted training alarms on the "Ejection" command every shift; Compiled a daily report on the time actually worked; Participated in the assembly of well drilling and casing equipment; Participated in the elimination of incidents involving the seizure of the drill string and casing strings; Carried out the submission of applications for cementing casing columns, for the provision of equipment in the form of a crane and transporting equipment; Performed calculation of top-up and well volumes; Produced a report on the work done at a conference call with the company's management; Carried out work on visual agitation to create cleanliness in the workplace; Engaged in the write-off of material assets on a monthly basis; I filled out a timesheet for employees of the drilling crew; Supervised compliance with labor discipline rules by drilling crew employees and contractors.
  • Drilling Foreman

    Rosneft
    2016.06-2017.07(a year)
    Measured drilling tools and casing. Compiled a measure when drilling a well and when running casing strings; Supervised the production activities of the drilling crew; Participated in the assembly of well drilling and casing equipment; Carried out regular monitoring of well drilling parameters; Organized the work of the drilling crew during the elimination of complications, provided appropriate reporting; Conducted training alarms on the "Ejection" command every shift; Compiled a daily report on the time actually worked; Ensured that the drilling crew fulfilled the requirements of industrial safety; Controlled the operation of the drilling rig equipment, filled in the operating time; Carried out control over contractors on the drilling rig.
  • Drilling Engineer

    Well Workover Operations Company
    2014.03-2016.06(2 years)
    Cleaned my workplace, cleaned equipment in the process of drilling wells; Worked on a rotary platform during tripping operations under the guidance of a driller; Managed automatic and machine keys; Engaged in the preparation and processing of drilling mud; Supervised the operation of mud pumps, carried out their start-up and repair; Participated in the dismantling and installation of drilling rigs; Participated in the elimination of complications and incidents at the well; Worked as a riding worker during round-trip operations.

Educational experience

  • udmurt state university - russia

    Drilling oil and gas wells
    2009.09-2014.07(5 years)
    Drilling engineer

Languages

English
Normal
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me