Arif

Commissioning Engineer (Substation)
RajasthanNationality India
Share

Summary

Electrical Engineer with 13 Years of Experience in Electrical Installation, Testing, Commissioning and maintenance of All major Electrical Equipment's like Power Transformers, CT, PT, Isolators, relays etc. Where I Can be helpful to organization: I have a good experience in Electrical Operation & Maintenance for 5 years and last 7 years i am working for Electrical Testing and maintenance company. I can be helpful for standardizing scope of work for various Electrical Project, maintenance and servicing activities that generally all plants take. It would be beneficial to organization having more than 4 plants and 25 Substation across India and Gulf. Know Vendors from where obsolete spares can be purchased or from where specialized services can be taken apart from OEM like Online/ Offline Partial discharge test of GIS, AIS, Cables, Panels & Transforme testing & Overhauling, HT Motor Testing, Transformer Testing, Overhauling & Filtration, etc. Learnt a lot in last 12 years from my own and from my Seniors too. Can Reduce plant electricity Bills, Increase plant Energy efficiency, Can help in Reduction of Budget of Electrical Department Reduce Breakdown cost. Implementation of proper maintenance activities during routine and Shutdown. Currently also working on to reduce Electrical breakdown, standardized good maintenance practice across industries Experienced in Planning and Execution of Shut down jobs and Material and Manpower arrangement correspondingly. Hard Working, Positive Attitude, Team Management.

Work experience

  • Commissioning Engineer (Substation)

    Energoprojekt ENTEL
    2026.01-Current(7 months)
  • Assistant Manager

    JSW Energy Ltd
    2024.04-2026.01(2 years)
    1) Project involved: 315 MVA ABB Power Transformer Testing and Maintenance, 400/33 kV Equipment testing and Maintenance, Relay Testing and modification as per site requirement, 400kV and 33kV Over head line Inspection and Maintenance, 33kV ABB Unigear ZS2 Switchgear maintenance and testing, 400kV Switching Etc. 2) 132/33KV DOLVI-1, 100MW Tuljapur: 50 MVA Vidhyut Power Transformer Testing and Maintenance, 132/33 kV Equipment testing and Maintenance, Relay Testing and modification as per site requirement, 132kV and 33kV Over head line Inspection and Maintenance, 33kV ABB Unigear ZS2 Switchgear maintenance and testing, 132kV Switching Etc.
  • Assistant Manager ( Substation)

    Wind World India L.T.D
    2023.01-2024.04(a year)
    O&M , Project involved: 220/33 kV Substation (230.4 MW Jajiya SS and 456 MW Bhu SS), 132/33kV Substation (135.17 MW Temderai SS), 220 kV, 132 kV, 33 kV Transmission Line Operation, testing and maintenance. 119 MVA ABB, 119 MVA AREVA Power Transformer Testing and Maintenance, 220/33 kV, 132/33kV Equipment testing and Maintenance, Relay Testing and modification as per site requirement, 220kV, 132kV and 33kV Over head line Inspection and Maintenance, 33kV outdoor Siemens SWGR maintenance and testing, 220kV, 132kV, 33kV Switching Etc.
  • Sr. Electrical Engineer (Substation)

    TÜV Rheinland Group
    2021.12-2023.01(a year)
    Project involved: 1) Torrent Power 115MW Wind Project Khabaliya, Gujarat, 220/33KV Substation, 220KV and 33KV Overhead Line. 2) Adani Green Energy Limited, Jaislamer, Rajasthan. (Hybrid project 250MW Wind), 220/33KV Substation, 33KV Overhead Line.
  • Electrical Inspector (Substation)

    Energoprojekt Entel
    2017.04-2021.12(5 years)
    Project Involved: 1: KAHARMAA (Qatar General Electricity & Water Corporation) Phase 12 and Phase 13 Substation project. Involved in HV system of 400kV, 220kV, 132kV, 66kV, 11kV GIS Substation Testing and commissioning of Electrical Equipment at site. 2: Manateq- Special Economic Zones. Involved in HV system of 132kV and 11kV GIS substation Testing and commissioning of Electrical Equipment at site.
  • Electrical Engineer (Substation)

    VA TECH WABAG LTD.
    2014.06-2017.04(3 years)
    Project Involved in jaipur Municipal Corporation Rajasthan. 1: Operation and Maintenance of 66/11kV Substation Delawas plant. 2: Operation and Maintenance of 2 * 62.5 MLD STP and WTP plant Delawas Jaipur. 3:Operation and Maintenance of 1 *50 MLD WTP plant Khor Jaipur.
  • Electrical Engineer

    Thermax Limited
    2012.11-2014.05(2 years)
    Project Involved: 1: Electrical Maintenance and Operation work in 8MW Power plant at J.K. White Cements Work Gotan, Rajasthan. 2: Electrical Testing and comissioning work in 125MW Power plant and 220 kV Substation at Reliance Power Pokhran Rajasthan.

Educational experience

  • Rajasthan Technical University

    Bachelor of Technology - BTech Electrical & Electronics engg.
  • State Board of Technical Education and Training

    Diploma Electrical and Electronics Engineering
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me