MOHAMMED MAHMOUD YOUSSEF

Electrical Department Technical Office Manager
MaleElectrical EngineerLive in Saudi ArabiaNationality Egypt
Share

Work experience

  • Electrical Department Technical Office Manager

    Construction & Planning Company (C&P) (Saudi Company)
    2023.02-Current(3 years)
    BIM Projects Reviewed project technical data, prepared value engineering reports, and modified/redesigned original designs. Assisted with budgeting and cost control by monitoring expenses and identifying cost-saving opportunities. Modeled designs using Revit. Coordinated between MEP systems, architecture, and structural models. Provided on-site technical support for construction issues. Led team tasks by assigning duties based on skills. Reviewed and submitted shop drawings.
  • Assistant Head of Electrical Department

    Marrafiq Mep Company, A Subsidiary of Inertia Holdings
    2015.12-2023.01(7 years)
    Analyzed tender projects and prepared technical and financial offers. Broke down BOQ items and reported to the Cost Control Department. Provided on-site technical support. Led team tasks and liaised between departments. Reviewed and submitted shop drawings, as-built drawings, and electrical work invoices.
  • Senior Electrical Site Engineer

    Environment Technology Construction Company, Saudi Arabia
    2013.09-2015.11(2 years)
    Led a team of supervisors, technicians, and laborers. Reviewed technical data and prepared shop drawings. Supervised electric works including lighting, power, light current outlets, cable trays, and cable trunk. Installed power cables, panel boards, ATS, RMU, light current, security systems, and landscape lighting networks.
  • Senior Technical Office Engineer

    Amllak Construction Company
    2012.06-2013.08(a year)
    Studied tender projects and prepared technical and financial offers. Conducted BOQ breakdown and designed projects. Provided on-site technical support. Reviewed and submitted shop and as-built drawings, as well as electrical invoices.
  • Electrical Site Engineer

    Elbably Electro Mechanical Company
    2008.08-2012.05(4 years)
    Led a team for MEP works at water treatment plants. Supervised electrical works (lighting, power, light current outlets). Installed motors with MCC panels, cable trays, power cables, panel boards, ATS, RMU, security systems, generators, and transformers.

Projects

  • Ministry of Economy and Planning Administration, Riyadh Air Administration Building at GACA kapsarc (chairman office, riyadh), laperle mall (jeddah), 25 mall (riyadh), mobily data center

  • Palestinian Embassy, IKEA branch mall of Arabia interior works, SODIC East El Shorouk City villas compound infrastructure works, toshiba el araby residential compound (5th settlement), west hills

  • Social Care Center (Jeddah, Ministry of Social Affairs), Social Development Center(taif, ministry of social affairs).

  • Hotel Engineering Authority House, a villa for the Egyptian Minister of Defense(with the engineering authority of the armed forces), menoufia stadium sport hall development.

  • Sewage Pumping Station (El-Nazlah, Fayoum), Sewage Treatment Plant (Port Said Airport), Nile water purification plant at mania governorate (pigag el-hattab, portopat, el-hawartah, bany samit), nile water

  • Governorate (Bany Ahmed, Bany Mousa), Yaqin Medical Center (Fayoum), Karoun Social Club (Fayoum)

  • Residential Towers

Educational experience

  • Fayoum University, Egypt

    Power & Electrical Machine Engineering

Languages

Arabic
Native
English
Fluent

Skills

Security Systems: CCTV, Access Control, Fire Alarm Design
Smart Building Automation: KNX, BMS Integration
Dailux
Revit
AutoCAD
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me