Amir

Pre-Commissioning Manager
MaleProject ExecutionLive in Saudi ArabiaNationality Pakistan
Share

Work experience

  • Pre-Commissioning Manager

    Sinohydro
    2025.09-Current(9 months)
    Responsibilities: lead a team of engineers and technicians responsible for executing pre- commissioning activities. Develop and implement pre-commissioning execution plans and schedules Manage contractors and vendors involved in system testing and pre- commissioning work. Prepare readiness matrix for energization of electrical equipment’s. Manage the preparation of energization packages, including test certificates and inspection reports. Lead a team for energization of packaged substations, switchboards, automatic transfer switch, panel boards. Coordinate with engineering, construction, commissioning, and operations teams. Review and approve pre-commissioning documentation such as checklist, test procedures, and reports. Supervise inspection and testing activities at site. Report progress to senior management and SAPMT & proponent. LEAD CONSTRUCTION ENGINEER. (Aramco Approved)
  • Aramco Approved Lead Electrical Engineer

    Sinohydro
    2025.01-2025.09(9 months)
    KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES Responsibilities: Develop and control the activities and deliverables associated to the project scope in order to provide sound engineering solutions for projects while ensuring adherence to applicable regulations, codes, standards and specifications within the framework of budget, schedule and quality. Supervision of Construction, ensure that correct type & Aramco approved material & Equipment Installed as per IFC drawing & approved materials. Monitoring and reporting to management on the progress of all electrical activities within the projects. Installation of panel board, switchgear SWB, ATS, EDG as per IFC drawing manufacture recommendation & Saudi Aramco stander including NEC requirement. Finding sound engineering solutions for technical queries, deviations, technical issues and alternatives that have been submitted for replying to it. Supervision the electrical activities within the area of responsibility, ensuring the compliance with the QA/QC and HSE requirements. Ensuring Safety Standards and project specification are met and reviewing shop drawings, materials submittal and as built drawings prepared and Receipting of the material delivered and executed works by the contractor. Providing coordination and problem solving between different Contractors and Consultants. Taking part in decision making for the acceptance of electrical material, technical submittal and suppliers. The construction process using technical expertise and management skills. POWERCHINA | SEPCO.
  • Lead Electrical Engineer

    SEPCO Arabia
    2022.05-2025.01(3 years)
    Responsibilities: Detailed study of IFC drawing prior to start the execution of installation 13.8KV Substations. Ensure that correct type & Aramco approved material & Equipment Installed as per IFC drawing & approved material Submittals. Leading, Guiding & Supervising the Team of Electricians, Technicians and Supervisors etc. Make sure that construction activities as per planned progress Metrix. Installation of cable tray as per IFC drawing and as per international standards. Installation of panel board, switchgears, MCC and TRFs as per IFC drawing manufacture recommendation & Saudi Aramco stander including NEC requirement. Installation of lighting system as per location for Indoor / outdoor & classified zone. Cable laying & termination for LV system, MV system & coordinating with Saudi Aramco, PMT, PID and POD for proper implementation of procedures. Take active role in Testing & Commissioning of Electrical System like Panel Board, switchgear, MCC TRF, LV/MV cables as per Saudi Aramco Pre Commissioning & as per manufacture recommendation & Aramco Standards. Performed IR test for cables, Transformer, Bus Bar, MCC. Performed IR test for CT/PT & Transformer/Motor Winding. Performed winding resistance test for Transformer, Motor, CT/PT. Preformed Torque test. Korea Electric Power Corporaon (KEPCO) 1x660MW SUPERCRITICAL COAL FIRED POWER PLANT
  • Pre-Commissioning Engineer

    Korea Electric Power Corpora�on (KEPCO)
    2021.04-2022.05(a year)
    Responsibilities: Develop and implement pre-commissioning execution plans and schedules Lead a team of site engineers and technicians responsible for executing pre- commissioning activities. Manage contractors and vendors involved in system testing and pre- commissioning work. Prepare readiness matrix for energization of electrical equipment’s. Manage the preparation of energization packages, including test certificates and inspection reports. Lead a team for energization of packaged substations, switchboards, automatic transfer switch, panel boards. Coordinate with engineering, construction, commissioning, and operations teams. Review and approve pre-commissioning documentation such as check sheets, test plans, and reports. Attending and generating punch list as a part of mechanical completion, checks, and test activities. Ensure there are no category A punch list items at the end of pre-commissioning activities. Testing of switchyard equipment’s like Power Panels, Lighting Panels, Switchboard, Switchgear, CT, VT, LV Breakers, MV Breakers, Isolator, Earth switch, Motor, distribution transformer and Bus Bar. Witness of all testing and commissioning activities for substation equipment’s Reviewing Contractors Contractual obligations, QA/QC plans and procedures to verify if they comply with Company Contractual conditions. Assist in the successful commissioning, flawless start-up and normal operational activities through equipment inspection and maintenance activities. Monitor site progress through weekly & monthly progress meetings with contractors and sub-contractor. China Power HUB Operating Company 1320MW China Hub Coal Power Project, Hub Balochistan
  • Operation & maintenance Engineer

    SPIC
    2020.12-2021.04(5 months)
    Responsibilities: Overall supervision of the plants having 660*2 MW Power generating capacity. Supervise startup, Synchronizing, loading rates, Shutdown of the unit, & handing over for maintenance requirements. Maintaining shift logbook, with the description of the events during the operation, in case of partial or total breakdown of supply, to restore the station supply in minimum possible time. Making isolations of different equipment for breakdown and preventive maintenance. Assist maintenance personnel in respective failure analysis and analysis of other major defects and suggest suitable recommendations. Assisting the management in proposal development for Varity of works for Management, Operation and Maintenance To check firefighting equipment and log complaints, if any Carry out inspection after shutdown. To prepare daily generation statistics of power station Preparation of Daily Performance Report. This is a management report that describes the operation and maintenance data for the routine maintenance of the plant. Maintaining discipline by ensuring punctuality of the worker and observance of rules. Fill accident form in case of injury to staff member, as per factory act. Any task assigned by head of department pertaining to the functions of the engineering section. Energy & Power Department - Government of Khyber Pakhtunkhwa. 120MW TARBELA 5TH EXTENSION PROJECT IN 2020
  • Electrical Engineer

    Energy & Power Department - Government of Khyber Pakhtunkhwa
    2020.08-2020.12(5 months)
    Responsibilities: Worked extensively in pre-commissioning, commissioning, and operation phases of power house and substation systems. Assisted in installation, testing, and commissioning of major electrical equipment including: o Power Transformers (step-up/step-down) o MV/LV Switchboards o Circuit Breakers, Isolators, Disconnectors o Protection & Control Relays (overcurrent, differential, distance, and transformerprotection) o Current Transformers (CTs) & Potential Transformers (PTs/VTs) o Bus Bars, Cables & Cable Terminations o Battery Chargers, DC Systems, and UPS Performed insulation resistance tests, ratio tests, polarity checks, secondary injection testing, and functional testing of protection relays. Monitored and recorded pre-commissioning checks including continuity tests, HV/MV cable testing, and equipment energization sequences. Assisted in synchronization, load tests, and operation of generators under varying load conditions. Involved in shutdown/startup procedures, switching operations activities in compliance with safety standards. Maintained daily logs, prepared test reports, punch lists, and technical documentation for commissioning progress. Actively followed HSE regulations, permit-to-work procedures, and electrical isolation/LOTO systems during commissioning and operation.

Educational experience

  • Engineering

Languages

Urdu
Native
English
Fluent

Certificates

Aramco Approved Lead Electrical Engineer
年度质量管理先进
OSHA Course Certificate
NEBOSH IGC
Resume Search
Nationality
Job category
City or country
Jobs
Candidates
Blog
Me