Aarif
Technical Delivery Manager
HR Specialist/AssistantLive in United KingdomNationality
Share
Work experience
Technical Delivery Manager
Sungrow Power Supply Co., Ltd.2022.09-Current(4 years)(3 years 5 months) • Responsible to connect with on-site Field Service Engineer and Customers, for smooth Overseas Project delivery of Battery Energy Storage Systems in North America, South America, Europe, UK and Middle East region. • Provide subject matter expertise in support of the technical interactions during project development, project execution, product presentation and training support to Sales and Service team. • Actively manages project changes directly with the Client in coordination with R&D and Project department in HQ. • Make sure PCS, BESS, DCDC and Battery Pack compatibility with LC, BSC, CMU and BMU communication together with system integrated with HVAC and FSS (as per NFPA regulations) for different range Projects at 0.25C/0.5C/1C rate. • Setup EMS/SCADA communication system of client with Battery Energy Storage System (Modbus, CAN, TCP/IP) to monitor and control system as per requirements. • Co-work with R&D team in China to solve and improve product quality problems, support after sales and service technical issues for smooth project delivery. • Monitor and manage project execution of various Battery Energy Storage Solution projects include engineering, construction support, quality check and commissioning support during entire process of Project Delivery. • Involve actively with both customer and Field Service team during cold commissioning, hot commissioning and Tests such as Capacity test, AVR test, RTE test, FFR test and FSS test etc.Engineering Project Manager
LuxshareTech2020.10-2022.09(2 years)Work with cross functions internally and with Apple team, with following job responsibilities, but not limited to given below; • Preparing RFQ response with Cross-functions, and submitting proposals to customers. • Leading SMT, ENCAP, BACKEND & TEST NPI projects with (PROTO,EVT, DVT, RR to MP builds), executing Roadmap, and Tacking Product development with respect to schedule. • Closely work with EPM, BPM, IE, CapEx, MPM, DFM, PE, IT, FA & Quality team to track & monitor Line bring-up, on-line & Off-line Equipment and fixture, Line Layout, Line bring-up, and main problem points (MIL) in each NPI build stage. • NPI progress tracking with Cross functions regarding the procurement of consumables, fixture, equipment, new buy & retrofit, tracking ETD/ETA and shipment. • Ensure EIH, HW/Process CTQ, Line Qual, and production schedule NPI build demand & customer demand for Golden & Copy line. • Control UPH as per QPL, CT, DT (planned & unplanned), and NG units with technical cross functions, and improve Yield and follow-up to close FACA. • Tracking of DOE & testing progress of various projects, OK2input & OK2ship tracking. • Monitoring daily Open-Close meeting report on product development during trial production progress. • Arrange timely meetings with customers, communicate and coordinate on different project stages.Project Management Engineer
Titan Wind Energy (Suzhou) Co., Ltd2019.10-2020.09(a year)• Produce, Install and troubleshoot Wind Blade Mold for Blade production at the customer facility. • Project execution include installation, commissioning, and troubleshooting of mold leveling (PS/SS), spanwise/chordwise alignment, Turning system, lifting system, locking system, Overbite & Gap, heating a system including software automation (electric heating & water heating), Vacuum system, Laser tracking by Verisurf/FARO for Main Shell Mold, Root Flange, Spar Cap Mold, Shear Web Mold, Shear Web Gantry Fixture, etc., all together. • Responsible to implement product specifications as per scope. • Team Lead to every process of project execution of Wind blade Mold Installation at customer premises. • Managing, time, resources, and manpower on a business trip, making sure on-time project delivery.Project Management Engineer
Shenzhen CLOU Electronics Co., Ltd2018.09-2019.06(10 months)Working on two International EPC projects, from the tender opening till execution. 1. Procurement of Plant for Gas Insulated 220kV Substation (Design, Supply,and Installation), at Nepal. 2. Design, Supply, Erection, Installation, Testing and Commissioning of two (2 No) new 33/11KV, 2X20/26 MVA (GIS) Substation (Turnkey Basis), at confidential. As a member of the overseas project team, I deal with customers, subcontractors, suppliers, service providers, and agents directly at NEPAL and indirectly related to the project. Different initiatives have been taken to improve the project monthly progress. Participate in design, bill of quantities, project progress analysis, on-site management issues, financial matters, payment release, VAT-Tax handling issues. Also actively involved in sub-contracting civil work to the local company at NEPAL, negotiated in the perspective of time and money. Procurement from a technical perspective. Scheduled timely meeting with consultant and client representatives of the project. Submitted weekly project reports to the leadership.Research Scholar
Harbin Institute of Technology2016.09-2018.07(2 years)(1 year 11 months)Project Engineer
Cogeneration Consult2014.11-2016.03(a year)(1 year 5 months) • Performing energy audit in industries, i.e. textile sector etc, to detect energy losses and suggest the technical staff to get steps to minimize these losses to get efficiency. • Giving appropriate training to the power plant operator, Boiler operator, and other technical staff. • Design the project after meeting with Chief Engineer of Industry deciding about the future extension of plant/industry as per industrial need. Verify piping and instrumentation diagram P&ID, Working on BOQ, Receiving quotations from suppliers, and analyzing suitable quotation for the project as per standard. • Supervise contractor job weekly and follow the work performance report as per plan. • After execution, testing & commissioning, Handing Over & Taking Over documentation process begins. • Checking & analyzing the behavior of Boiler, Generator and all associated auxiliaries of a power plant for healthy operation. • Project Executed: • Installation, Commissioning of Caterpillar, Waukesha, Jenbacher Gas Gen- set. • Installation, Commissioning Gas Booster to handle a gas low-pressure situation. • Purchasing documentation, Installing, Commissioning Cooling Tower & Radiator. • Installation, Commissioning of Waste Heat Recovery Boiler, that generates steam by consuming generators exhaust heat 500C.Electrical Engineer
National Electric Company, Pre-Qualified Contractor at2012.08-2014.10(2 years)Electrical Engineer
Formerly (KESC)2012.08-2014.10(2 years)(2 years 3 months) • Supervised Transformer installation. • Supervised on site Transmission line projects, both overhead as well as underground. • Well known about the transmission of HT/LT lines, 220/400/11000/132000 volts. • Inspection of Electrical / Civil Works at newly constructed/energized Grid Station, transmission line projects, Development of project execution plans, project schedule, contract strategies, cost/time/resource planning, and organizing timely implementation. • Monitoring progress & reporting to Hi-Ups. • Co-coordinating with Engineering team for daily maintenance activities e.g civil works, earthing, PTW, shut-down, de-hydration of T/former oil, Testing of Auto Transformer and its auxiliaries. • Inspection of CCVT, CT, Isolator, Surge Arrestor, Power Transformer installed in 500 kV substation. • Keeping sure work executed, strictly as per design and standard declared in SOP by implementing safety standards.Trainee Engineer
cogeneration Consult2012.05-2012.07(3 months)
Educational experience
Nawabshah
Electrical and Electronics engineering2008.01-2011.01(3 years)
Certificates
ECITB - CCNSG Safety Passport
Course
CCNSG Safety Passport
Summer School Diploma Certificate
Resume Search
Nationality
Job category
City or country
Sort by
Contact way
44****1647
en**@**om
Membership will unlock the resume
Also view

